AGL 40.21 Increased By ▲ 0.18 (0.45%)
AIRLINK 127.64 Decreased By ▼ -0.06 (-0.05%)
BOP 6.67 Increased By ▲ 0.06 (0.91%)
CNERGY 4.45 Decreased By ▼ -0.15 (-3.26%)
DCL 8.73 Decreased By ▼ -0.06 (-0.68%)
DFML 41.16 Decreased By ▼ -0.42 (-1.01%)
DGKC 86.11 Increased By ▲ 0.32 (0.37%)
FCCL 32.56 Increased By ▲ 0.07 (0.22%)
FFBL 64.38 Increased By ▲ 0.35 (0.55%)
FFL 11.61 Increased By ▲ 1.06 (10.05%)
HUBC 112.46 Increased By ▲ 1.69 (1.53%)
HUMNL 14.81 Decreased By ▼ -0.26 (-1.73%)
KEL 5.04 Increased By ▲ 0.16 (3.28%)
KOSM 7.36 Decreased By ▼ -0.09 (-1.21%)
MLCF 40.33 Decreased By ▼ -0.19 (-0.47%)
NBP 61.08 Increased By ▲ 0.03 (0.05%)
OGDC 194.18 Decreased By ▼ -0.69 (-0.35%)
PAEL 26.91 Decreased By ▼ -0.60 (-2.18%)
PIBTL 7.28 Decreased By ▼ -0.53 (-6.79%)
PPL 152.68 Increased By ▲ 0.15 (0.1%)
PRL 26.22 Decreased By ▼ -0.36 (-1.35%)
PTC 16.14 Decreased By ▼ -0.12 (-0.74%)
SEARL 85.70 Increased By ▲ 1.56 (1.85%)
TELE 7.67 Decreased By ▼ -0.29 (-3.64%)
TOMCL 36.47 Decreased By ▼ -0.13 (-0.36%)
TPLP 8.79 Increased By ▲ 0.13 (1.5%)
TREET 16.84 Decreased By ▼ -0.82 (-4.64%)
TRG 62.74 Increased By ▲ 4.12 (7.03%)
UNITY 28.20 Increased By ▲ 1.34 (4.99%)
WTL 1.34 Decreased By ▼ -0.04 (-2.9%)
BR100 10,086 Increased By 85.5 (0.85%)
BR30 31,170 Increased By 168.1 (0.54%)
KSE100 94,764 Increased By 571.8 (0.61%)
KSE30 29,410 Increased By 209 (0.72%)

The infrastructure development work in DHA Phase-VIII including construction of major arterial/collateral roads, lying of water supply networks, sewerage system, underground electric cable, construction of grid stations and sewerage treatment plants were being completed swiftly with a renewed impetus.
DHA Administrator Brigadier Aamer Raza Qureshi informed the delegation of DHA Phase-VIII, led by its President Dr Khalid Butt, in a meeting held at DHA Main Office to discuss various problems of the residents. Concerned DHA officials were also present on the occasion. He said that DHA Phase-VIII Dev Dte was fully geared up to promptly solve the residents problems including streetlights, sewerage, road repair and bushing cutting etc till the time the area was handed over to CBC for maintenance function.
The Administrator elaborated that roads, streets and sewerage network made in DHA Phase-VIII a decade back had mostly deteriorated and became un-serviceable due to non-use and non-maintenance since not many residents had yet inhabited the area. He said the infrastructural facilities therefore were being again reconstructed/re-laid and a huge expenditure on lying underground electric transmission lines and construction of electric sub-stations were being by DHA to give impetus to development and construction activity in the area.
He said the huge development expenditure and exorbitant rise in construction cost explain the dynamics of levying additional development charges in the area. He however promised that the demand to give suitable relief in additional development charges to the residents who got A&B leases prior to levying of these charges would be favourably considered at the appropriate level.-PR

Copyright Business Recorder, 2011

Comments

Comments are closed.