AIRLINK 205.81 Increased By ▲ 5.52 (2.76%)
BOP 10.24 Decreased By ▼ -0.25 (-2.38%)
CNERGY 7.06 Decreased By ▼ -0.15 (-2.08%)
FCCL 34.66 Decreased By ▼ -0.28 (-0.8%)
FFL 17.10 Decreased By ▼ -0.32 (-1.84%)
FLYNG 24.68 Decreased By ▼ -0.17 (-0.68%)
HUBC 131.18 Increased By ▲ 3.37 (2.64%)
HUMNL 13.98 Increased By ▲ 0.17 (1.23%)
KEL 4.91 Decreased By ▼ -0.09 (-1.8%)
KOSM 6.81 Decreased By ▼ -0.22 (-3.13%)
MLCF 44.34 Decreased By ▼ -0.28 (-0.63%)
OGDC 221.77 Decreased By ▼ -0.38 (-0.17%)
PACE 7.22 Decreased By ▼ -0.20 (-2.7%)
PAEL 42.69 Decreased By ▼ -0.11 (-0.26%)
PIAHCLA 17.13 Decreased By ▼ -0.26 (-1.5%)
PIBTL 8.42 Decreased By ▼ -0.09 (-1.06%)
POWER 9.09 Decreased By ▼ -0.06 (-0.66%)
PPL 190.86 Decreased By ▼ -1.87 (-0.97%)
PRL 43.49 Increased By ▲ 1.99 (4.8%)
PTC 24.79 Increased By ▲ 0.35 (1.43%)
SEARL 102.66 Increased By ▲ 1.39 (1.37%)
SILK 1.02 Decreased By ▼ -0.03 (-2.86%)
SSGC 42.74 Decreased By ▼ -1.13 (-2.58%)
SYM 18.40 Decreased By ▼ -0.36 (-1.92%)
TELE 9.26 Decreased By ▼ -0.28 (-2.94%)
TPLP 13.15 Increased By ▲ 0.07 (0.54%)
TRG 68.78 Increased By ▲ 2.59 (3.91%)
WAVESAPP 10.42 Decreased By ▼ -0.11 (-1.04%)
WTL 1.80 Increased By ▲ 0.02 (1.12%)
YOUW 4.00 Decreased By ▼ -0.04 (-0.99%)
BR100 12,034 Decreased By -5.6 (-0.05%)
BR30 36,777 Increased By 88.7 (0.24%)
KSE100 114,496 Decreased By -308.5 (-0.27%)
KSE30 36,003 Decreased By -99.2 (-0.27%)

All Pakistan Textile Mills Association (Aptma) has offered to cut its share of electricity for the power looms industry. According to the spinning industry sources, it was highlighted in a meeting held at the Pepco office with DG Pepco in the chair that the power looms industry in Faisalabad was in a great trouble due to long hours of load shedding with substantial drop in power generation.
It was further pointed out that total electricity demand of power looms is some 150MW, which is becoming impossible for the Faisalabad Electricity Supply Co (Fesco) to meet with due to the situation beyond its control. Sources said the Aptma representatives offered their share of electricity and pressed the DG Pepco to bring down load shedding duration for power looms industry in Faisalabad. It may be noted that the electricity demand of Aptma members is about 500MW, which has become very precious with three-day gas load shedding in the country.

Copyright Business Recorder, 2011

Comments

Comments are closed.