AIRLINK 175.89 Decreased By ▼ -0.93 (-0.53%)
BOP 10.98 Decreased By ▼ -0.11 (-0.99%)
CNERGY 8.00 Increased By ▲ 0.06 (0.76%)
FCCL 46.12 Increased By ▲ 1.18 (2.63%)
FFL 16.07 Decreased By ▼ -0.04 (-0.25%)
FLYNG 27.42 Decreased By ▼ -0.86 (-3.04%)
HUBC 143.96 Increased By ▲ 2.18 (1.54%)
HUMNL 13.35 Increased By ▲ 0.10 (0.75%)
KEL 4.50 Increased By ▲ 0.07 (1.58%)
KOSM 5.98 Decreased By ▼ -0.05 (-0.83%)
MLCF 59.50 Increased By ▲ 1.05 (1.8%)
OGDC 232.75 Increased By ▲ 8.56 (3.82%)
PACE 5.88 Decreased By ▼ -0.05 (-0.84%)
PAEL 47.48 Increased By ▲ 1.58 (3.44%)
PIAHCLA 17.97 Decreased By ▼ -0.19 (-1.05%)
PIBTL 10.58 Decreased By ▼ -0.02 (-0.19%)
POWER 11.38 Increased By ▲ 0.08 (0.71%)
PPL 193.30 Increased By ▲ 7.82 (4.22%)
PRL 37.00 Increased By ▲ 0.09 (0.24%)
PTC 23.77 Increased By ▲ 0.08 (0.34%)
SEARL 99.87 Increased By ▲ 1.47 (1.49%)
SILK 1.15 No Change ▼ 0.00 (0%)
SSGC 37.19 Decreased By ▼ -0.19 (-0.51%)
SYM 14.95 Decreased By ▼ -0.06 (-0.4%)
TELE 7.75 Decreased By ▼ -0.07 (-0.9%)
TPLP 10.87 Decreased By ▼ -0.09 (-0.82%)
TRG 65.14 Decreased By ▼ -1.00 (-1.51%)
WAVESAPP 10.91 Increased By ▲ 0.03 (0.28%)
WTL 1.34 No Change ▼ 0.00 (0%)
YOUW 3.81 No Change ▼ 0.00 (0%)
AIRLINK 175.89 Decreased By ▼ -0.93 (-0.53%)
BOP 10.98 Decreased By ▼ -0.11 (-0.99%)
CNERGY 8.00 Increased By ▲ 0.06 (0.76%)
FCCL 46.12 Increased By ▲ 1.18 (2.63%)
FFL 16.07 Decreased By ▼ -0.04 (-0.25%)
FLYNG 27.42 Decreased By ▼ -0.86 (-3.04%)
HUBC 143.96 Increased By ▲ 2.18 (1.54%)
HUMNL 13.35 Increased By ▲ 0.10 (0.75%)
KEL 4.50 Increased By ▲ 0.07 (1.58%)
KOSM 5.98 Decreased By ▼ -0.05 (-0.83%)
MLCF 59.50 Increased By ▲ 1.05 (1.8%)
OGDC 232.75 Increased By ▲ 8.56 (3.82%)
PACE 5.88 Decreased By ▼ -0.05 (-0.84%)
PAEL 47.48 Increased By ▲ 1.58 (3.44%)
PIAHCLA 17.97 Decreased By ▼ -0.19 (-1.05%)
PIBTL 10.58 Decreased By ▼ -0.02 (-0.19%)
POWER 11.38 Increased By ▲ 0.08 (0.71%)
PPL 193.30 Increased By ▲ 7.82 (4.22%)
PRL 37.00 Increased By ▲ 0.09 (0.24%)
PTC 23.77 Increased By ▲ 0.08 (0.34%)
SEARL 99.87 Increased By ▲ 1.47 (1.49%)
SILK 1.15 No Change ▼ 0.00 (0%)
SSGC 37.19 Decreased By ▼ -0.19 (-0.51%)
SYM 14.95 Decreased By ▼ -0.06 (-0.4%)
TELE 7.75 Decreased By ▼ -0.07 (-0.9%)
TPLP 10.87 Decreased By ▼ -0.09 (-0.82%)
TRG 65.14 Decreased By ▼ -1.00 (-1.51%)
WAVESAPP 10.91 Increased By ▲ 0.03 (0.28%)
WTL 1.34 No Change ▼ 0.00 (0%)
YOUW 3.81 No Change ▼ 0.00 (0%)
BR100 12,609 Increased By 173.5 (1.4%)
BR30 39,262 Increased By 678.1 (1.76%)
KSE100 117,772 Increased By 1139.1 (0.98%)
KSE30 36,296 Increased By 474.7 (1.33%)

The Khyber Pakhtunkhwa government will take up issue of power tariff with the federal government for provision of cheaper electricity to masses in the province. The provincial government is focusing to meet growing energy needs by initiating different hydel power generation projects in the province, said that provincial Minister, Mian Iftikhar Hussain, while speaking at a function in connection with provincial autonomy here at Nishtar Hall Peshawar.
He renewed the pledged that provincial government is committed to overcome with growing energy shortage after provincial autonomy under the 18th constitutional amendments. "We will have in a position to generate sufficient electricity to meet domestic energy demand and fix its prices at lowest after passage of 18th constitutional amendments, he determined.
Mian Iftikhar has termed that the passage of 18th constitutional amendments would strength democracy and institutions in the country, saying that the dream has become true due to joint efforts of all democratic forces. He stressed the need of national thinking for provision of equal rights to all citizens of the country, saying that the progress and development are paramount in a balanced society. He recalled that the Dhaka and Bangladesh debacle had remembered as more popular incidents in the world, which was occurred due to absence of provincial rights and autonomy in the country.
Mian Iftikhar praised the all political forces for resolution of the key national issue of the provincial autonomy through a democratic process. He said that dream has become true due kind efforts of President Asif Ali Zardari, Prime Minster Yousuf Raza Gilani, Chairman Implementation Commission on 18th Amendment Senator Raza Rabani and leaders of all political parties.
He said the provincial government is keenly focusing to overcome with growing energy shortage following devolution process under the 18th constitutional amendments. The minister informed that the feasibility study of 7 hydel power projects have been completed out of which two power generation projects in Swat and Chitral will be functionalised within next two months. Later, a culture show was also presented in which culture and literary figures took part.

Copyright Business Recorder, 2011

Comments

Comments are closed.