AGL 40.15 Increased By ▲ 0.14 (0.35%)
AIRLINK 127.20 Increased By ▲ 0.20 (0.16%)
BOP 6.77 Increased By ▲ 0.08 (1.2%)
CNERGY 4.53 Increased By ▲ 0.02 (0.44%)
DCL 8.61 Decreased By ▼ -0.03 (-0.35%)
DFML 40.90 Decreased By ▼ -0.14 (-0.34%)
DGKC 85.90 Increased By ▲ 0.29 (0.34%)
FCCL 33.15 Increased By ▲ 0.04 (0.12%)
FFBL 66.68 Increased By ▲ 0.58 (0.88%)
FFL 11.45 Decreased By ▼ -0.10 (-0.87%)
HUBC 111.39 Increased By ▲ 0.28 (0.25%)
HUMNL 14.77 Decreased By ▼ -0.05 (-0.34%)
KEL 5.15 Decreased By ▼ -0.02 (-0.39%)
KOSM 7.60 Decreased By ▼ -0.06 (-0.78%)
MLCF 40.16 Decreased By ▼ -0.05 (-0.12%)
NBP 60.72 Increased By ▲ 0.21 (0.35%)
OGDC 194.59 Increased By ▲ 0.49 (0.25%)
PAEL 26.90 Increased By ▲ 0.18 (0.67%)
PIBTL 7.60 Increased By ▲ 0.23 (3.12%)
PPL 154.14 Increased By ▲ 0.35 (0.23%)
PRL 26.16 Decreased By ▼ -0.05 (-0.19%)
PTC 17.70 Increased By ▲ 0.52 (3.03%)
SEARL 85.70 Increased By ▲ 0.10 (0.12%)
TELE 7.79 Increased By ▲ 0.22 (2.91%)
TOMCL 34.10 Decreased By ▼ -0.29 (-0.84%)
TPLP 9.55 Increased By ▲ 0.73 (8.28%)
TREET 16.89 Increased By ▲ 0.07 (0.42%)
TRG 62.88 Increased By ▲ 0.33 (0.53%)
UNITY 27.45 Increased By ▲ 0.16 (0.59%)
WTL 1.32 Increased By ▲ 0.02 (1.54%)
BR100 10,153 Increased By 41.9 (0.41%)
BR30 31,267 Increased By 79.3 (0.25%)
KSE100 95,620 Increased By 624.6 (0.66%)
KSE30 29,682 Increased By 200.4 (0.68%)

Power situation registered stability for second consecutive day amidst marathon meetings of policymakers on the subject in the capital. Heavy rain cooled down temperature substantially, bringing the demand down to 17554MW amidst rise in generation to 14732MW, leaving the system with a manageable shortfall of 2822MW.
It may be noted that both the President Asif Ali Zardari and Prime Minister Yousuf Raza Gilani had taken serious notice of Pepco's failure in ensuring uninterrupted power supply during Sehr and Iftar since the start of Ramazan. Accordingly, a high-level committee was formed to look into the reasons of loadshedding. Sources said the committee members have taken the heads of DISCOs to the task and made it clear to them that no negligence would be acceptable from now onwards. Also, the issue of circular debt was taken up by the committee, listening to the IPPs and a strong commitment to resolve their issues.
Meanwhile, power generation improved impressively on all counts. The hydel, thermal, IPPs and RPPs stood at 5910MW, 2085mw, 6596MW and 141MW. Power supply to the KESC was recorded at 650MW.

Copyright Business Recorder, 2011

Comments

Comments are closed.