AGL 40.00 No Change ▼ 0.00 (0%)
AIRLINK 127.04 No Change ▼ 0.00 (0%)
BOP 6.67 No Change ▼ 0.00 (0%)
CNERGY 4.51 No Change ▼ 0.00 (0%)
DCL 8.55 No Change ▼ 0.00 (0%)
DFML 41.44 No Change ▼ 0.00 (0%)
DGKC 86.85 No Change ▼ 0.00 (0%)
FCCL 32.28 No Change ▼ 0.00 (0%)
FFBL 64.80 No Change ▼ 0.00 (0%)
FFL 10.25 No Change ▼ 0.00 (0%)
HUBC 109.57 No Change ▼ 0.00 (0%)
HUMNL 14.68 No Change ▼ 0.00 (0%)
KEL 5.05 No Change ▼ 0.00 (0%)
KOSM 7.46 No Change ▼ 0.00 (0%)
MLCF 41.38 No Change ▼ 0.00 (0%)
NBP 60.41 No Change ▼ 0.00 (0%)
OGDC 190.10 No Change ▼ 0.00 (0%)
PAEL 27.83 No Change ▼ 0.00 (0%)
PIBTL 7.83 No Change ▼ 0.00 (0%)
PPL 150.06 No Change ▼ 0.00 (0%)
PRL 26.88 No Change ▼ 0.00 (0%)
PTC 16.07 No Change ▼ 0.00 (0%)
SEARL 86.00 No Change ▼ 0.00 (0%)
TELE 7.71 No Change ▼ 0.00 (0%)
TOMCL 35.41 No Change ▼ 0.00 (0%)
TPLP 8.12 No Change ▼ 0.00 (0%)
TREET 16.41 No Change ▼ 0.00 (0%)
TRG 53.29 No Change ▼ 0.00 (0%)
UNITY 26.16 No Change ▼ 0.00 (0%)
WTL 1.26 No Change ▼ 0.00 (0%)
BR100 10,010 Increased By 126.5 (1.28%)
BR30 31,023 Increased By 422.5 (1.38%)
KSE100 94,192 Increased By 836.5 (0.9%)
KSE30 29,201 Increased By 270.2 (0.93%)

Federal Minister for Petroleum Dr Asim Hussain on Monday said that switching off gas for 90 days to the textile industry was totally wrong. "We will continue and compensate you during winter season," he said while addressing a select gathering of gas-fed textile millers on the invitation of All Pakistan Textile Mills Association (Aptma) at a local club.
He said the president and the prime minister were aware of the problems faced by textile industry. According to him, no serious effort was made in the past to deal with the problem of gas shortage, saying that the planning of gas distribution to industry was very poor. The minister said import of 500 mmcfd has been delayed from March 2012 to October, as construction of first terminal in Karachi would start by January.
"We've stepped up exploration, 125mcfd gas would be inducted in the system by December 7, followed by another 30mmcfd within next two months," he added. Dr Asim said that plans were chalked out to lay down dedicated supply line for the industry. Aptma chief Gohar Ejaz said a short supply of gas has resulted in 14 percent reduction in production in October 2011. He said the textile industry was contributing heavily as a backbone of Pakistan economy.

Copyright Business Recorder, 2011

Comments

Comments are closed.