AGL 34.85 Decreased By ▼ -0.35 (-0.99%)
AIRLINK 127.77 Increased By ▲ 4.54 (3.68%)
BOP 5.15 Increased By ▲ 0.11 (2.18%)
CNERGY 3.83 Decreased By ▼ -0.08 (-2.05%)
DCL 7.98 Decreased By ▼ -0.17 (-2.09%)
DFML 44.01 Decreased By ▼ -0.21 (-0.47%)
DGKC 74.15 Decreased By ▼ -0.20 (-0.27%)
FCCL 24.35 Decreased By ▼ -0.12 (-0.49%)
FFBL 43.65 Decreased By ▼ -4.55 (-9.44%)
FFL 8.85 Increased By ▲ 0.07 (0.8%)
HUBC 141.50 Decreased By ▼ -4.35 (-2.98%)
HUMNL 10.50 Decreased By ▼ -0.35 (-3.23%)
KEL 3.95 Decreased By ▼ -0.05 (-1.25%)
KOSM 7.75 Decreased By ▼ -0.25 (-3.13%)
MLCF 32.40 Decreased By ▼ -0.40 (-1.22%)
NBP 56.49 Decreased By ▼ -0.66 (-1.15%)
OGDC 143.00 Decreased By ▼ -2.35 (-1.62%)
PAEL 25.35 Decreased By ▼ -0.40 (-1.55%)
PIBTL 5.82 Increased By ▲ 0.06 (1.04%)
PPL 111.25 Decreased By ▼ -5.55 (-4.75%)
PRL 24.03 Increased By ▲ 0.03 (0.13%)
PTC 11.00 Decreased By ▼ -0.05 (-0.45%)
SEARL 58.19 Decreased By ▼ -0.22 (-0.38%)
TELE 7.49 No Change ▼ 0.00 (0%)
TOMCL 41.15 Increased By ▲ 0.05 (0.12%)
TPLP 8.64 Increased By ▲ 0.33 (3.97%)
TREET 15.09 Decreased By ▼ -0.11 (-0.72%)
TRG 54.62 Decreased By ▼ -0.58 (-1.05%)
UNITY 27.87 Increased By ▲ 0.02 (0.07%)
WTL 1.30 Decreased By ▼ -0.04 (-2.99%)
BR100 8,555 Decreased By -16.4 (-0.19%)
BR30 26,642 Decreased By -634.2 (-2.33%)
KSE100 81,594 Increased By 135 (0.17%)
KSE30 25,803 Increased By 3.5 (0.01%)

Loadshedding in some industrial areas of the city continued on Thursday with varied duration. The industrialists said that the KESC had no justification to carry out loadshedding in industrial areas when it was getting 150 MMCFD gas and the required power from Wapda.
Korangi Association of Trade and Industry (Kati) Chairman Ehtishamuddin said that KESC carried out loadshedding in Korangi industrial area with varied duration in different sectors. He said that he had discussed the loadshedding issue with the KESC high ups who assured that efforts were being made to carry out loadshedding from 2 to 6 am in industrial areas so that industrial production was not affected.
However, according to a KESC SMS received by industrialists, 8 hours loadshedding will be carried out in industrial areas from 6 pm to 10 pm and 2 am to 6 am. Site Association of Industry (SAI) Chairman Mohammad Irfan Moton said that KESC was carrying out 4 hours loadshedding in Site industrial area from 6 pm to 10 pm which according to him was badly affecting the industrial activities.
North Karachi Association of Trade and Industry (NKATI) Chairman Abdul Rasheed Fodderwala said that no loadshedding was witnessed in North Karachi industrial area during the day. Federal B Area Association of Trade and Industry (FBAATI) Chairman Masroor Alvi said that industries operated in full swing during the day as there was no loadshedding in the industrial area.

Copyright Business Recorder, 2011

Comments

Comments are closed.