AGL 34.89 Decreased By ▼ -0.31 (-0.88%)
AIRLINK 129.55 Increased By ▲ 6.32 (5.13%)
BOP 5.15 Increased By ▲ 0.11 (2.18%)
CNERGY 3.84 Decreased By ▼ -0.07 (-1.79%)
DCL 8.09 Decreased By ▼ -0.06 (-0.74%)
DFML 44.34 Increased By ▲ 0.12 (0.27%)
DGKC 75.25 Increased By ▲ 0.90 (1.21%)
FCCL 24.60 Increased By ▲ 0.13 (0.53%)
FFBL 49.30 Increased By ▲ 1.10 (2.28%)
FFL 8.85 Increased By ▲ 0.07 (0.8%)
HUBC 142.50 Decreased By ▼ -3.35 (-2.3%)
HUMNL 10.50 Decreased By ▼ -0.35 (-3.23%)
KEL 3.97 Decreased By ▼ -0.03 (-0.75%)
KOSM 7.90 Decreased By ▼ -0.10 (-1.25%)
MLCF 33.00 Increased By ▲ 0.20 (0.61%)
NBP 56.85 Decreased By ▼ -0.30 (-0.52%)
OGDC 144.50 Decreased By ▼ -0.85 (-0.58%)
PAEL 25.50 Decreased By ▼ -0.25 (-0.97%)
PIBTL 5.78 Increased By ▲ 0.02 (0.35%)
PPL 116.30 Decreased By ▼ -0.50 (-0.43%)
PRL 24.05 Increased By ▲ 0.05 (0.21%)
PTC 11.05 No Change ▼ 0.00 (0%)
SEARL 58.80 Increased By ▲ 0.39 (0.67%)
TELE 7.48 Decreased By ▼ -0.01 (-0.13%)
TOMCL 41.15 Increased By ▲ 0.05 (0.12%)
TPLP 8.65 Increased By ▲ 0.34 (4.09%)
TREET 15.15 Decreased By ▼ -0.05 (-0.33%)
TRG 54.55 Decreased By ▼ -0.65 (-1.18%)
UNITY 27.88 Increased By ▲ 0.03 (0.11%)
WTL 1.31 Decreased By ▼ -0.03 (-2.24%)
BR100 8,646 Increased By 74.6 (0.87%)
BR30 27,117 Decreased By -158.3 (-0.58%)
KSE100 82,136 Increased By 677.1 (0.83%)
KSE30 26,037 Increased By 237.2 (0.92%)

Loadshedding in some industrial areas of the city continued on Thursday with varied duration. The industrialists said that the KESC had no justification to carry out loadshedding in industrial areas when it was getting 150 MMCFD gas and the required power from Wapda.
Korangi Association of Trade and Industry (Kati) Chairman Ehtishamuddin said that KESC carried out loadshedding in Korangi industrial area with varied duration in different sectors. He said that he had discussed the loadshedding issue with the KESC high ups who assured that efforts were being made to carry out loadshedding from 2 to 6 am in industrial areas so that industrial production was not affected.
However, according to a KESC SMS received by industrialists, 8 hours loadshedding will be carried out in industrial areas from 6 pm to 10 pm and 2 am to 6 am. Site Association of Industry (SAI) Chairman Mohammad Irfan Moton said that KESC was carrying out 4 hours loadshedding in Site industrial area from 6 pm to 10 pm which according to him was badly affecting the industrial activities.
North Karachi Association of Trade and Industry (NKATI) Chairman Abdul Rasheed Fodderwala said that no loadshedding was witnessed in North Karachi industrial area during the day. Federal B Area Association of Trade and Industry (FBAATI) Chairman Masroor Alvi said that industries operated in full swing during the day as there was no loadshedding in the industrial area.

Copyright Business Recorder, 2011

Comments

Comments are closed.