AGL 40.00 No Change ▼ 0.00 (0%)
AIRLINK 127.04 No Change ▼ 0.00 (0%)
BOP 6.67 No Change ▼ 0.00 (0%)
CNERGY 4.51 No Change ▼ 0.00 (0%)
DCL 8.55 No Change ▼ 0.00 (0%)
DFML 41.44 No Change ▼ 0.00 (0%)
DGKC 86.85 No Change ▼ 0.00 (0%)
FCCL 32.28 No Change ▼ 0.00 (0%)
FFBL 64.80 No Change ▼ 0.00 (0%)
FFL 10.25 No Change ▼ 0.00 (0%)
HUBC 109.57 No Change ▼ 0.00 (0%)
HUMNL 14.68 No Change ▼ 0.00 (0%)
KEL 5.05 No Change ▼ 0.00 (0%)
KOSM 7.46 No Change ▼ 0.00 (0%)
MLCF 41.38 No Change ▼ 0.00 (0%)
NBP 60.41 No Change ▼ 0.00 (0%)
OGDC 190.10 No Change ▼ 0.00 (0%)
PAEL 27.83 No Change ▼ 0.00 (0%)
PIBTL 7.83 No Change ▼ 0.00 (0%)
PPL 150.06 No Change ▼ 0.00 (0%)
PRL 26.88 No Change ▼ 0.00 (0%)
PTC 16.07 No Change ▼ 0.00 (0%)
SEARL 86.00 No Change ▼ 0.00 (0%)
TELE 7.71 No Change ▼ 0.00 (0%)
TOMCL 35.41 No Change ▼ 0.00 (0%)
TPLP 8.12 No Change ▼ 0.00 (0%)
TREET 16.41 No Change ▼ 0.00 (0%)
TRG 53.29 No Change ▼ 0.00 (0%)
UNITY 26.16 No Change ▼ 0.00 (0%)
WTL 1.26 No Change ▼ 0.00 (0%)
BR100 10,010 Increased By 126.5 (1.28%)
BR30 31,023 Increased By 422.5 (1.38%)
KSE100 94,192 Increased By 836.5 (0.9%)
KSE30 29,201 Increased By 270.2 (0.93%)

The Pakistan Water and Power Development Authority (Wapda) has completed the task of installing six desalination plants along Manchar Lake for providing potable water to the populace residing in the areas adjacent to the lake. The honourable Chief Justice of Pakistan, during the hearing of a suo moto notice, had directed Wapda and the Sindh government to install desalination plants along the lake to provide contamination-free, safe drinking water to the fishermen folk of the area.
The water treatment plants installed by Wapda in compliance with the orders of the Supreme Court have cumulative design capacity of 6000 litres per hour. Over 2,000 families of fishermen folk (about 16,000 to 20,000 persons) are being facilitated with quality potable water (total dissolved solids 200 - 300 particles per million) by treating high saline effluent of Manchar Lake (total dissolved solids 5000 - 7000 particles per million).
Wapda has also made arrangements for effective operation and maintenance of the plants. In addition to the six plants mentioned above, Wapda is also installing another six plants of the same capacity on behalf of the Sindh government. These plants, expected to be operational by April 30, will provide safe drinking water to another 16,000 to 20,000 people along Manchar Lake.

Copyright Business Recorder, 2012

Comments

Comments are closed.