AGL 38.20 Increased By ▲ 0.05 (0.13%)
AIRLINK 129.30 Increased By ▲ 4.23 (3.38%)
BOP 7.85 Increased By ▲ 1.00 (14.6%)
CNERGY 4.66 Increased By ▲ 0.21 (4.72%)
DCL 8.35 Increased By ▲ 0.44 (5.56%)
DFML 38.86 Increased By ▲ 1.52 (4.07%)
DGKC 82.20 Increased By ▲ 4.43 (5.7%)
FCCL 33.64 Increased By ▲ 3.06 (10.01%)
FFBL 75.75 Increased By ▲ 6.89 (10.01%)
FFL 12.83 Increased By ▲ 0.97 (8.18%)
HUBC 110.72 Increased By ▲ 6.22 (5.95%)
HUMNL 14.03 Increased By ▲ 0.54 (4%)
KEL 5.22 Increased By ▲ 0.57 (12.26%)
KOSM 7.69 Increased By ▲ 0.52 (7.25%)
MLCF 40.08 Increased By ▲ 3.64 (9.99%)
NBP 72.51 Increased By ▲ 6.59 (10%)
OGDC 189.18 Increased By ▲ 9.65 (5.38%)
PAEL 25.74 Increased By ▲ 1.31 (5.36%)
PIBTL 7.38 Increased By ▲ 0.23 (3.22%)
PPL 153.45 Increased By ▲ 9.75 (6.78%)
PRL 25.52 Increased By ▲ 1.20 (4.93%)
PTC 17.92 Increased By ▲ 1.52 (9.27%)
SEARL 82.50 Increased By ▲ 3.93 (5%)
TELE 7.63 Increased By ▲ 0.41 (5.68%)
TOMCL 32.50 Increased By ▲ 0.53 (1.66%)
TPLP 8.48 Increased By ▲ 0.35 (4.31%)
TREET 16.74 Increased By ▲ 0.61 (3.78%)
TRG 56.01 Increased By ▲ 1.35 (2.47%)
UNITY 28.85 Increased By ▲ 1.35 (4.91%)
WTL 1.34 Increased By ▲ 0.05 (3.88%)
BR100 10,684 Increased By 595 (5.9%)
BR30 31,445 Increased By 1935.9 (6.56%)
KSE100 99,269 Increased By 4695.1 (4.96%)
KSE30 31,032 Increased By 1587.6 (5.39%)

On the directives of the Chief Minister Punjab Muhammad Shahbaz Sharif, Bus Rapid Transit System (BRTS) is being executed at a cost of Rs 21 billion in the city for providing world-class transport facilities to the people of Lahore. This was informed during a meeting of a four-member delegation of Turkish consultant firm ULASIM Istanbul, which called on the Lahore Development Authority Director General Ahad Khan Cheema here on Tuesday.
Chief Engineer TEPA Saeed Akhter and Project Director Mazhar Hussain Asif briefed the delegation about the ongoing progress on this project. The delegation was also told that the 30 kilometers long project, extending from Gajumatta at Ferozepur Road to Shahdara, has been divided into eight packages where civil work was being executed simultaneously, the 7.5 kilometers long package of project from Kalima Chowk to Bhatti Gate will be constructed as an elevated express way, which would be eight meters high from the ground level.

Copyright Business Recorder, 2012

Comments

Comments are closed.