AGL 39.58 Decreased By ▼ -0.42 (-1.05%)
AIRLINK 131.22 Increased By ▲ 2.16 (1.67%)
BOP 6.81 Increased By ▲ 0.06 (0.89%)
CNERGY 4.71 Increased By ▲ 0.22 (4.9%)
DCL 8.44 Decreased By ▼ -0.11 (-1.29%)
DFML 41.47 Increased By ▲ 0.65 (1.59%)
DGKC 82.09 Increased By ▲ 1.13 (1.4%)
FCCL 33.10 Increased By ▲ 0.33 (1.01%)
FFBL 72.87 Decreased By ▼ -1.56 (-2.1%)
FFL 12.26 Increased By ▲ 0.52 (4.43%)
HUBC 110.74 Increased By ▲ 1.16 (1.06%)
HUMNL 14.51 Increased By ▲ 0.76 (5.53%)
KEL 5.19 Decreased By ▼ -0.12 (-2.26%)
KOSM 7.61 Decreased By ▼ -0.11 (-1.42%)
MLCF 38.90 Increased By ▲ 0.30 (0.78%)
NBP 64.01 Increased By ▲ 0.50 (0.79%)
OGDC 192.82 Decreased By ▼ -1.87 (-0.96%)
PAEL 25.68 Decreased By ▼ -0.03 (-0.12%)
PIBTL 7.34 Decreased By ▼ -0.05 (-0.68%)
PPL 154.07 Decreased By ▼ -1.38 (-0.89%)
PRL 25.83 Increased By ▲ 0.04 (0.16%)
PTC 17.81 Increased By ▲ 0.31 (1.77%)
SEARL 82.30 Increased By ▲ 3.65 (4.64%)
TELE 7.76 Decreased By ▼ -0.10 (-1.27%)
TOMCL 33.46 Decreased By ▼ -0.27 (-0.8%)
TPLP 8.49 Increased By ▲ 0.09 (1.07%)
TREET 16.62 Increased By ▲ 0.35 (2.15%)
TRG 57.40 Decreased By ▼ -0.82 (-1.41%)
UNITY 27.51 Increased By ▲ 0.02 (0.07%)
WTL 1.37 Decreased By ▼ -0.02 (-1.44%)
BR100 10,504 Increased By 59.3 (0.57%)
BR30 31,226 Increased By 36.9 (0.12%)
KSE100 98,080 Increased By 281.6 (0.29%)
KSE30 30,559 Increased By 78 (0.26%)

Power shortfall hovered around 5000MW due to less inflow in Tarbela and short supply of fuel besides technical faults in a few Independent Power Producers (IPPs). According to the NTDC sources, the hydel generation affected negatively due to less inflow in Tarbela Dam. Meanwhile, both KAPCO, 140MW, and Orient, 106MW, were out of system due to non-provision of fuel and technical fault in 207MW Halmore. The hydel, thermal and IPPs generation stood at 4208MW, 1379MW and 5820MW respectively.

Copyright Business Recorder, 2012

Comments

Comments are closed.