AGL 31.35 Increased By ▲ 0.15 (0.48%)
AIRLINK 143.00 Increased By ▲ 0.30 (0.21%)
BOP 5.12 Increased By ▲ 0.04 (0.79%)
CNERGY 4.11 Increased By ▲ 0.07 (1.73%)
DCL 9.49 Decreased By ▼ -0.21 (-2.16%)
DFML 49.51 Decreased By ▼ -0.69 (-1.37%)
DGKC 79.10 Decreased By ▼ -0.40 (-0.5%)
FCCL 22.75 Decreased By ▼ -0.30 (-1.3%)
FFBL 46.78 Increased By ▲ 0.68 (1.48%)
FFL 9.57 Increased By ▲ 0.52 (5.75%)
HUBC 153.49 Decreased By ▼ -0.01 (-0.01%)
HUMNL 11.29 Decreased By ▼ -0.18 (-1.57%)
KEL 4.17 Increased By ▲ 0.03 (0.72%)
KOSM 9.26 Decreased By ▼ -1.01 (-9.83%)
MLCF 33.30 Decreased By ▼ -0.30 (-0.89%)
NBP 58.70 Increased By ▲ 1.85 (3.25%)
OGDC 136.75 Decreased By ▼ -0.50 (-0.36%)
PAEL 25.88 Increased By ▲ 1.43 (5.85%)
PIBTL 6.05 Increased By ▲ 0.08 (1.34%)
PPL 112.35 Decreased By ▼ -0.65 (-0.58%)
PRL 24.38 Increased By ▲ 0.03 (0.12%)
PTC 11.88 Decreased By ▼ -0.07 (-0.59%)
SEARL 57.40 Decreased By ▼ -0.36 (-0.62%)
TELE 7.77 Increased By ▲ 0.17 (2.24%)
TOMCL 41.99 Increased By ▲ 0.11 (0.26%)
TPLP 8.49 Decreased By ▼ -0.16 (-1.85%)
TREET 15.23 Increased By ▲ 0.13 (0.86%)
TRG 51.50 Decreased By ▼ -0.95 (-1.81%)
UNITY 28.00 Increased By ▲ 0.14 (0.5%)
WTL 1.42 Increased By ▲ 0.08 (5.97%)
BR100 8,340 Decreased By -5.8 (-0.07%)
BR30 26,956 Increased By 47.9 (0.18%)
KSE100 78,898 Increased By 34.4 (0.04%)
KSE30 25,008 Decreased By -18.2 (-0.07%)
Business & Finance

Boeing 737 MAX not expected to fly before October, FAA preparing directive

  • The crisis has cost Boeing more than $18 billion, slashed production and hobbled its supply chain, with criminal and congressional investigations still ongoing.
  • the FAA said it had completed three days of certification test flights on the 737 MAX's automated flight control system.
Published July 21, 2020

WASHINGTON: The Federal Aviation Administration (FAA) said on Tuesday it plans to issue a proposed airworthiness directive for the Boeing 737 MAX in the "near future" to address changes made since the plane was grounded in March 2019 after two fatal crashes killed 346 people.

An official briefed on the matter told Reuters that the FAA is unlikely to unground the 737 MAX before sometime in October. Boeing Co did not immediately comment but has said previously it expects to resume deliveries before Sept. 30 following regulatory approval.

The crisis has cost Boeing more than $18 billion, slashed production and hobbled its supply chain, with criminal and congressional investigations still ongoing.

The FAA said the public will have 45 days to comment on "proposed design changes and crew procedures to mitigate the safety issues identified during the investigations that followed the Lion Air and Ethiopian Airlines accidents." The FAA noted there are still some key steps before the plane can resume commercial service.

On July 1, the FAA said it had completed three days of certification test flights on the 737 MAX's automated flight control system.

Final planning is under way for the FAA's Flight Standardization Board (FSB) and the Joint Operations Evaluation Board (JOEB) review of proposed training for flight crews, based on design changes and crew procedures.

The JOEB will include regulators from Canada, Europe and Brazil and will evaluate minimum pilot training requirements. The FSB will issue a draft report for public comment addressing JOEB findings.

The FAA will review Boeing's final design documentation to evaluate compliance with regulations and the multi-agency Technical Advisory Board will review the final Boeing submission and issue a report prior to a final FAA determination of compliance.

Boeing agreed to add significant safeguards to a key safety system tied to both crashes, make other software updates and move wiring bundles.

Comments

Comments are closed.