AIRLINK 193.56 Decreased By ▼ -1.27 (-0.65%)
BOP 9.95 Increased By ▲ 0.14 (1.43%)
CNERGY 7.93 Increased By ▲ 0.57 (7.74%)
FCCL 40.65 Increased By ▲ 2.07 (5.37%)
FFL 16.86 Increased By ▲ 0.41 (2.49%)
FLYNG 27.75 Increased By ▲ 0.21 (0.76%)
HUBC 132.58 Increased By ▲ 0.83 (0.63%)
HUMNL 13.89 Increased By ▲ 0.03 (0.22%)
KEL 4.60 Decreased By ▼ -0.06 (-1.29%)
KOSM 6.62 Decreased By ▼ -0.04 (-0.6%)
MLCF 47.60 Increased By ▲ 2.21 (4.87%)
OGDC 213.91 Decreased By ▼ -0.08 (-0.04%)
PACE 6.93 Increased By ▲ 0.07 (1.02%)
PAEL 41.24 Increased By ▲ 1.18 (2.95%)
PIAHCLA 17.15 Increased By ▲ 0.36 (2.14%)
PIBTL 8.41 Increased By ▲ 0.09 (1.08%)
POWER 9.64 Increased By ▲ 0.21 (2.23%)
PPL 182.35 Increased By ▲ 0.16 (0.09%)
PRL 41.96 Increased By ▲ 0.13 (0.31%)
PTC 24.90 Increased By ▲ 0.34 (1.38%)
SEARL 106.84 Increased By ▲ 4.31 (4.2%)
SILK 0.99 Decreased By ▼ -0.01 (-1%)
SSGC 40.10 Increased By ▲ 0.66 (1.67%)
SYM 17.47 Increased By ▲ 0.14 (0.81%)
TELE 8.84 Increased By ▲ 0.08 (0.91%)
TPLP 12.75 No Change ▼ 0.00 (0%)
TRG 66.95 Increased By ▲ 1.55 (2.37%)
WAVESAPP 11.33 Increased By ▲ 0.22 (1.98%)
WTL 1.79 Increased By ▲ 0.09 (5.29%)
YOUW 4.07 Increased By ▲ 0.13 (3.3%)
BR100 12,045 Increased By 70.8 (0.59%)
BR30 36,580 Increased By 433.6 (1.2%)
KSE100 114,038 Increased By 594.4 (0.52%)
KSE30 35,794 Increased By 159 (0.45%)
Pakistan

NHA striving for early accomplishment of western alignment of CPEC

  • He said the project links Gwadar Port with National Highway network (N-25) near Surab/Quetta.
Published July 22, 2020

ISLAMABAD: National Highway Authority is striving for early completion of western alignment of China-Pakistan Economic Corridor (CPEC) as one of the top most priorities of the government.

An official of NHA told APP on Wednesday that construction work on the first component of Western alignment of CPEC Islamabad-Dera Ismail Khan Motorway was in full swing and over 70 percent of the work had already been completed.

The four-lane motorway from Hakla, near Islamabad to D I Khan would reduce the travel time from 5 hours to 2.5 hours and help usher an era of economic prosperity in some of the underdeveloped regions, he said.

The second part of the corridor 540 km Yarik-Hub-Quetta Highway, he said would be upgraded to motorway standard, thus reducing distance from Islamabad to Quetta to only 830 kms and eight hours travel time on this new motorway standard four-lane expressway.

The estimated cost of upgrading Yarik to Quetta via Zhob section is Rs. 142b.

He said 235 Yarik-Zhob section was under procurement process whereas bidding process for Zhob-Kuchlak (Quetta) road was underway.

The 448 km long Sorab-Hoshab highway which forms an important link on the western route of the China-Pakistan Economic Corridor (CPEC) and has been built at an estimated cost of Rs. 22 billion.

He said the project links Gwadar Port with National Highway network (N-25) near Surab/Quetta.

The 193 kilometer portion between Gwadar-Hoshab sections was inaugurated in February 2016, he said.

Comments

Comments are closed.