AGL 38.02 Increased By ▲ 0.08 (0.21%)
AIRLINK 197.36 Increased By ▲ 3.45 (1.78%)
BOP 9.54 Increased By ▲ 0.22 (2.36%)
CNERGY 5.91 Increased By ▲ 0.07 (1.2%)
DCL 8.82 Increased By ▲ 0.14 (1.61%)
DFML 35.74 Decreased By ▼ -0.72 (-1.97%)
DGKC 96.86 Increased By ▲ 4.32 (4.67%)
FCCL 35.25 Increased By ▲ 1.28 (3.77%)
FFBL 88.94 Increased By ▲ 6.64 (8.07%)
FFL 13.17 Increased By ▲ 0.42 (3.29%)
HUBC 127.55 Increased By ▲ 6.94 (5.75%)
HUMNL 13.50 Decreased By ▼ -0.10 (-0.74%)
KEL 5.32 Increased By ▲ 0.10 (1.92%)
KOSM 7.00 Increased By ▲ 0.48 (7.36%)
MLCF 44.70 Increased By ▲ 2.59 (6.15%)
NBP 61.42 Increased By ▲ 1.61 (2.69%)
OGDC 214.67 Increased By ▲ 3.50 (1.66%)
PAEL 38.79 Increased By ▲ 1.21 (3.22%)
PIBTL 8.25 Increased By ▲ 0.18 (2.23%)
PPL 193.08 Increased By ▲ 2.76 (1.45%)
PRL 38.66 Increased By ▲ 0.49 (1.28%)
PTC 25.80 Increased By ▲ 2.35 (10.02%)
SEARL 103.60 Increased By ▲ 5.66 (5.78%)
TELE 8.30 Increased By ▲ 0.08 (0.97%)
TOMCL 35.00 Decreased By ▼ -0.03 (-0.09%)
TPLP 13.30 Decreased By ▼ -0.25 (-1.85%)
TREET 22.16 Decreased By ▼ -0.57 (-2.51%)
TRG 55.59 Increased By ▲ 2.72 (5.14%)
UNITY 32.97 Increased By ▲ 0.01 (0.03%)
WTL 1.60 Increased By ▲ 0.08 (5.26%)
BR100 11,727 Increased By 342.7 (3.01%)
BR30 36,377 Increased By 1165.1 (3.31%)
KSE100 109,513 Increased By 3238.2 (3.05%)
KSE30 34,513 Increased By 1160.1 (3.48%)

KARACHI: K-Electric (KE) has reiterated that no unscheduled load-shed is being carried out in any part of the city. Segmented load-shed (SLS) which is in line with the National Power Policy 2013 to address the issue of pervasive power theft and load-management which is on account of power shortfall follow a schedule which is duly notified to registered customers via SMS and is also available on the KE website.

Segmented Load-shed is based on the theft-profile of areas and is determined by the aggregate technical & commercial (AT&C) losses in any area. Due to KE's efforts of theft reduction today over 75% of Karachi is exempt from scheduled load-shed, while load-shed hours in remaining areas vary with the degree of power theft. Even in Very High Loss (VHL) areas, where losses extend above 45%, K-Electric supplies power up to 15~16 hours despite incurring losses and load-shedding does not exceed 7.5~8.5 hours. The power utility conducts a periodic review wherein it evaluates the loss of each area and profiles it as high or low loss respectively.

To counter power theft, c. 9,000 Pole-Mounted Transformers (PMTs) have been converted to Aerial Bundled Cables and regular kunda removal drives are also carried out. This year alone, close to 200,000 kg of illegal wires have been removed from electricity infrastructure in areas including Malir, Landhi, Korangi, Orangi, Baldia and Lyari. These efforts to address the societal menace of power-theft supplemented by community engagement have been successful in shifting areas such as Altaf Town and Ghazdarabad from high loss to low loss and resulted in Transmission and Distribution (T&D) losses reduction from 36% in 2009 to 19.7% in 2020.

While load-shed is routinely carried out in areas with pervasive power-theft and is independent of power supply, in contrast, load-management is necessitated in unavoidable circumstances when the gap between power supply and demand widens for a brief duration. -PR

Copyright Business Recorder, 2020

Comments

Comments are closed.