AGL 40.00 Decreased By ▼ -0.16 (-0.4%)
AIRLINK 129.53 Decreased By ▼ -2.20 (-1.67%)
BOP 6.68 Decreased By ▼ -0.01 (-0.15%)
CNERGY 4.63 Increased By ▲ 0.16 (3.58%)
DCL 8.94 Increased By ▲ 0.12 (1.36%)
DFML 41.69 Increased By ▲ 1.08 (2.66%)
DGKC 83.77 Decreased By ▼ -0.31 (-0.37%)
FCCL 32.77 Increased By ▲ 0.43 (1.33%)
FFBL 75.47 Increased By ▲ 6.86 (10%)
FFL 11.47 Increased By ▲ 0.12 (1.06%)
HUBC 110.55 Decreased By ▼ -1.21 (-1.08%)
HUMNL 14.56 Increased By ▲ 0.25 (1.75%)
KEL 5.39 Increased By ▲ 0.17 (3.26%)
KOSM 8.40 Decreased By ▼ -0.58 (-6.46%)
MLCF 39.79 Increased By ▲ 0.36 (0.91%)
NBP 60.29 No Change ▼ 0.00 (0%)
OGDC 199.66 Increased By ▲ 4.72 (2.42%)
PAEL 26.65 Decreased By ▼ -0.04 (-0.15%)
PIBTL 7.66 Increased By ▲ 0.18 (2.41%)
PPL 157.92 Increased By ▲ 2.15 (1.38%)
PRL 26.73 Increased By ▲ 0.05 (0.19%)
PTC 18.46 Increased By ▲ 0.16 (0.87%)
SEARL 82.44 Decreased By ▼ -0.58 (-0.7%)
TELE 8.31 Increased By ▲ 0.08 (0.97%)
TOMCL 34.51 Decreased By ▼ -0.04 (-0.12%)
TPLP 9.06 Increased By ▲ 0.25 (2.84%)
TREET 17.47 Increased By ▲ 0.77 (4.61%)
TRG 61.32 Decreased By ▼ -1.13 (-1.81%)
UNITY 27.43 Decreased By ▼ -0.01 (-0.04%)
WTL 1.38 Increased By ▲ 0.10 (7.81%)
BR100 10,407 Increased By 220 (2.16%)
BR30 31,713 Increased By 377.1 (1.2%)
KSE100 97,328 Increased By 1781.9 (1.86%)
KSE30 30,192 Increased By 614.4 (2.08%)

KARACHI: K-Electric (KE) has reiterated that no unscheduled load-shed is being carried out in any part of the city. Segmented load-shed (SLS) which is in line with the National Power Policy 2013 to address the issue of pervasive power theft and load-management which is on account of power shortfall follow a schedule which is duly notified to registered customers via SMS and is also available on the KE website.

Segmented Load-shed is based on the theft-profile of areas and is determined by the aggregate technical & commercial (AT&C) losses in any area. Due to KE's efforts of theft reduction today over 75% of Karachi is exempt from scheduled load-shed, while load-shed hours in remaining areas vary with the degree of power theft. Even in Very High Loss (VHL) areas, where losses extend above 45%, K-Electric supplies power up to 15~16 hours despite incurring losses and load-shedding does not exceed 7.5~8.5 hours. The power utility conducts a periodic review wherein it evaluates the loss of each area and profiles it as high or low loss respectively.

To counter power theft, c. 9,000 Pole-Mounted Transformers (PMTs) have been converted to Aerial Bundled Cables and regular kunda removal drives are also carried out. This year alone, close to 200,000 kg of illegal wires have been removed from electricity infrastructure in areas including Malir, Landhi, Korangi, Orangi, Baldia and Lyari. These efforts to address the societal menace of power-theft supplemented by community engagement have been successful in shifting areas such as Altaf Town and Ghazdarabad from high loss to low loss and resulted in Transmission and Distribution (T&D) losses reduction from 36% in 2009 to 19.7% in 2020.

While load-shed is routinely carried out in areas with pervasive power-theft and is independent of power supply, in contrast, load-management is necessitated in unavoidable circumstances when the gap between power supply and demand widens for a brief duration. -PR

Copyright Business Recorder, 2020

Comments

Comments are closed.