AGL 38.50 Increased By ▲ 0.93 (2.48%)
AIRLINK 132.41 Decreased By ▼ -0.09 (-0.07%)
BOP 5.59 Decreased By ▼ -0.05 (-0.89%)
CNERGY 3.85 Increased By ▲ 0.08 (2.12%)
DCL 8.70 Decreased By ▼ -0.17 (-1.92%)
DFML 40.75 Decreased By ▼ -0.25 (-0.61%)
DGKC 88.68 Decreased By ▼ -1.48 (-1.64%)
FCCL 35.30 Increased By ▲ 0.22 (0.63%)
FFBL 66.54 Increased By ▲ 0.04 (0.06%)
FFL 10.56 Increased By ▲ 0.41 (4.04%)
HUBC 109.65 Increased By ▲ 3.25 (3.05%)
HUMNL 14.66 Increased By ▲ 1.26 (9.4%)
KEL 4.83 Decreased By ▼ -0.03 (-0.62%)
KOSM 7.07 Increased By ▲ 0.22 (3.21%)
MLCF 42.63 Increased By ▲ 0.83 (1.99%)
NBP 59.71 Increased By ▲ 1.13 (1.93%)
OGDC 183.75 Increased By ▲ 2.50 (1.38%)
PAEL 25.69 Decreased By ▼ -0.01 (-0.04%)
PIBTL 5.91 Increased By ▲ 0.08 (1.37%)
PPL 147.75 Decreased By ▼ -0.65 (-0.44%)
PRL 23.55 Increased By ▲ 0.33 (1.42%)
PTC 16.45 Increased By ▲ 1.21 (7.94%)
SEARL 69.05 Increased By ▲ 0.26 (0.38%)
TELE 7.25 Increased By ▲ 0.01 (0.14%)
TOMCL 36.10 Increased By ▲ 0.10 (0.28%)
TPLP 7.56 Increased By ▲ 0.16 (2.16%)
TREET 14.20 Decreased By ▼ -0.04 (-0.28%)
TRG 50.96 Increased By ▲ 0.11 (0.22%)
UNITY 26.77 Increased By ▲ 0.37 (1.4%)
WTL 1.23 Increased By ▲ 0.02 (1.65%)
BR100 9,817 Increased By 48.9 (0.5%)
BR30 29,825 Increased By 425.1 (1.45%)
KSE100 92,335 Increased By 396.8 (0.43%)
KSE30 28,808 Increased By 64.2 (0.22%)

KARACHI: In view of the Pakistan Meteorological Department (Met) forecast for a new spell of rain and urban flooding, K-Electric has identified as many as 451 'hazardous' locations in Karachi, urging the Commissioner Iftikhar Shallwani for urgent administrative and professional support to address the challenges prior to the rains.

In a letter to the commissioner, KE has highlighted monsoon-caused challenges including water-logging and fallen trees that compromised utility service provision in last rains.

The power utility emphasised that these issues resulted in extended outages in some areas due to electricity infrastructure being damaged or inaccessible and requested for administrative support to address these civic challenges ahead of the rains on 6th Aug which are predicted by the PMD to be more intense than before.

KE mentioned that its teams faced an uphill task in restoring power to 222 locations including Delhi and Punjab colony, Khadda Market, Badar Commercial, SITE industrial area, University Road, Korangi, Sohrab Goth and more, due to overflowing and blocked stormwater channels which result in rainwater accumulation.The power utility requested for coordinated support from the PDMA and commissioner office for expedited drainage support.

The power utility also highlighted the issue of snapped power lines and damaged PMTs on account of trees falling on power lines and urged 'professional and urgent support' from city administration for pruning of oversized trees to avoid risk to life and property at 229 locations including West Wharf, Karachi University, Khayaban-e-Shaheen and Ziauddin Chowrangi.

The letter also talked about the pervasive issue of internet and TV cables which encroach on electricity poles and cause electrocution incidents. The power utility complained that the network operators had not started work as committed by them, and urged the Commissioner for intervention to ensure public safety. In addition the safety challenge of illegal street light switches placed on power poles and generator wires draped on electricity infrastructure were also highlighted as encroachments and KE assured the Commissioner of their intention to continue removing these hazards.

At the same time K-Electric requested the Commissioner office for a permanent solution to these challenges in coordination with Deputy Commissioners, KMC/DMC and Cantonment Areas. As the city's sole power supplier, KE prioritizes the safety of its customers and the delivery of its service promise above all else.

Copyright Business Recorder, 2020

Comments

Comments are closed.