AIRLINK 211.04 Increased By ▲ 1.49 (0.71%)
BOP 10.51 Increased By ▲ 0.05 (0.48%)
CNERGY 7.30 Decreased By ▼ -0.05 (-0.68%)
FCCL 34.40 Increased By ▲ 0.01 (0.03%)
FFL 18.05 No Change ▼ 0.00 (0%)
FLYNG 23.30 Increased By ▲ 0.38 (1.66%)
HUBC 132.00 Decreased By ▼ -0.49 (-0.37%)
HUMNL 14.22 Increased By ▲ 0.08 (0.57%)
KEL 5.10 Increased By ▲ 0.07 (1.39%)
KOSM 7.21 Increased By ▲ 0.14 (1.98%)
MLCF 44.92 Decreased By ▼ -0.28 (-0.62%)
OGDC 219.10 Increased By ▲ 0.72 (0.33%)
PACE 7.70 Increased By ▲ 0.12 (1.58%)
PAEL 42.24 Increased By ▲ 0.54 (1.29%)
PIAHCLA 17.55 Increased By ▲ 0.25 (1.45%)
PIBTL 8.74 Increased By ▲ 0.19 (2.22%)
POWERPS 12.50 No Change ▼ 0.00 (0%)
PPL 190.31 Increased By ▲ 1.28 (0.68%)
PRL 42.26 Decreased By ▼ -0.07 (-0.17%)
PTC 25.81 Increased By ▲ 0.64 (2.54%)
SEARL 104.17 Increased By ▲ 0.21 (0.2%)
SILK 1.03 No Change ▼ 0.00 (0%)
SSGC 40.90 Increased By ▲ 1.66 (4.23%)
SYM 19.30 Increased By ▲ 0.14 (0.73%)
TELE 9.42 Increased By ▲ 0.18 (1.95%)
TPLP 13.00 Decreased By ▼ -0.10 (-0.76%)
TRG 69.85 Increased By ▲ 0.67 (0.97%)
WAVESAPP 10.70 Decreased By ▼ -0.02 (-0.19%)
WTL 1.71 No Change ▼ 0.00 (0%)
YOUW 4.20 Increased By ▲ 0.06 (1.45%)
BR100 12,197 Increased By 117.6 (0.97%)
BR30 36,915 Increased By 312.3 (0.85%)
KSE100 116,812 Increased By 759 (0.65%)
KSE30 36,809 Increased By 231 (0.63%)

LAHORE: After the completion of a rainwater harvesting project at Lawrence Road, the governing body of the Lahore Development Authority (LDA) has approved two new similar projects worth Rs 240 million for the city which will store collectively 2.7 million gallons of rainwater.

In this connection a meeting of the governing body was held here on Wednesday and it was chaired by LDA Vice Chairman Sheikh Muhammad Imran. The meeting was attended by MPAs Sadia Sohail Rana (from Lahore) and Muhammad Atif (from Nankana Sahib), Wasa Vice Chairman Imtiaz Mehmood, Major (R) Syed Burhan Ali, Engineer Amir Riaz Qureshi, Wasa Managing Director Syed Zahid Aziz, and senior officials. On the occasion, LDA Director General Ahmed Aziz Tarar briefed the participants on the status of implementation of the decisions of the previous meeting.

The rainwater harvesting systems will be installed at Bismillah Park in Tajpura, and outside Sheeranwala Gate on Circular Road with a capacity of 1.2 million gallons and 1.5 million gallons, respectively. The LDA intends to lunch eight more similar projects in various parts of the city.

To control air pollution in the city, the meeting also approved the tree plantation at 24 spots reserved in LDA's housing schemes for which the LDA had allocated Rs 150 million in its annual budget.

The governing body also gave its consent for developing software, which will systematically combine all information relating to plots in the LDA housing schemes, including ownership record, area and location, property record and showing status whether a building under-construction is following building bylaws.

Moreover, revision of PC-1 of the Firdous Market Underpass project was also approved. Due to the increase in compensation for land acquired for the construction, the PC-1 had to be revised. However, the meeting was told that the overall cost of the project will not exceed the projects overall cost.

The meeting also decided to refund the excess amount of dues paid by the people to the LDA and subsequently it directed the LDA Director-General to prepare SOPs for the refunds.

Copyright Business Recorder, 2020

Comments

Comments are closed.