AIRLINK 173.68 Decreased By ▼ -2.21 (-1.26%)
BOP 10.82 Decreased By ▼ -0.16 (-1.46%)
CNERGY 8.26 Increased By ▲ 0.26 (3.25%)
FCCL 46.41 Increased By ▲ 0.29 (0.63%)
FFL 16.14 Increased By ▲ 0.07 (0.44%)
FLYNG 27.80 Increased By ▲ 0.38 (1.39%)
HUBC 146.32 Increased By ▲ 2.36 (1.64%)
HUMNL 13.40 Increased By ▲ 0.05 (0.37%)
KEL 4.39 Decreased By ▼ -0.11 (-2.44%)
KOSM 5.93 Decreased By ▼ -0.05 (-0.84%)
MLCF 59.66 Increased By ▲ 0.16 (0.27%)
OGDC 232.73 Decreased By ▼ -0.02 (-0.01%)
PACE 5.80 Decreased By ▼ -0.08 (-1.36%)
PAEL 47.98 Increased By ▲ 0.50 (1.05%)
PIAHCLA 17.75 Decreased By ▼ -0.22 (-1.22%)
PIBTL 10.40 Decreased By ▼ -0.18 (-1.7%)
POWER 11.32 Decreased By ▼ -0.06 (-0.53%)
PPL 191.48 Decreased By ▼ -1.82 (-0.94%)
PRL 36.83 Decreased By ▼ -0.17 (-0.46%)
PTC 23.20 Decreased By ▼ -0.57 (-2.4%)
SEARL 98.76 Decreased By ▼ -1.11 (-1.11%)
SILK 1.15 No Change ▼ 0.00 (0%)
SSGC 36.62 Decreased By ▼ -0.57 (-1.53%)
SYM 14.70 Decreased By ▼ -0.25 (-1.67%)
TELE 7.73 Decreased By ▼ -0.02 (-0.26%)
TPLP 10.75 Decreased By ▼ -0.12 (-1.1%)
TRG 66.01 Increased By ▲ 0.87 (1.34%)
WAVESAPP 10.82 Decreased By ▼ -0.09 (-0.82%)
WTL 1.32 Decreased By ▼ -0.02 (-1.49%)
YOUW 3.79 Decreased By ▼ -0.02 (-0.52%)
BR100 12,644 Increased By 35.1 (0.28%)
BR30 39,387 Increased By 124.3 (0.32%)
KSE100 117,807 Increased By 34.4 (0.03%)
KSE30 36,347 Increased By 50.4 (0.14%)

KARACHI: Korangi Causeway Road closed on Saturday for vehicular traffic after flooding in Malir River.

After water overflow, traffic police have closed both the tracks for traffic to avoid any untoward incident.

The traffic is being diverted to Expressway and Godam Chowrangi, said the police.

It is to be mentioned here that the flooding was caused in recent monsoon rainfall in Malir River and rising level of the water swept away the filter wall of the Malir spillway.

Comments

Comments are closed.