AGL 38.16 Decreased By ▼ -0.06 (-0.16%)
AIRLINK 134.19 Increased By ▲ 5.22 (4.05%)
BOP 8.85 Increased By ▲ 1.00 (12.74%)
CNERGY 4.69 Increased By ▲ 0.03 (0.64%)
DCL 8.67 Increased By ▲ 0.35 (4.21%)
DFML 39.78 Increased By ▲ 0.84 (2.16%)
DGKC 85.15 Increased By ▲ 3.21 (3.92%)
FCCL 34.90 Increased By ▲ 1.48 (4.43%)
FFBL 75.60 Decreased By ▼ -0.11 (-0.15%)
FFL 12.74 Decreased By ▼ -0.08 (-0.62%)
HUBC 109.45 Decreased By ▼ -0.91 (-0.82%)
HUMNL 14.10 Increased By ▲ 0.09 (0.64%)
KEL 5.40 Increased By ▲ 0.25 (4.85%)
KOSM 7.75 Increased By ▲ 0.08 (1.04%)
MLCF 41.37 Increased By ▲ 1.57 (3.94%)
NBP 69.70 Decreased By ▼ -2.62 (-3.62%)
OGDC 193.62 Increased By ▲ 5.33 (2.83%)
PAEL 26.21 Increased By ▲ 0.58 (2.26%)
PIBTL 7.42 Increased By ▲ 0.05 (0.68%)
PPL 163.85 Increased By ▲ 11.18 (7.32%)
PRL 26.36 Increased By ▲ 0.97 (3.82%)
PTC 19.47 Increased By ▲ 1.77 (10%)
SEARL 84.40 Increased By ▲ 1.98 (2.4%)
TELE 7.99 Increased By ▲ 0.40 (5.27%)
TOMCL 34.05 Increased By ▲ 1.48 (4.54%)
TPLP 8.72 Increased By ▲ 0.30 (3.56%)
TREET 17.18 Increased By ▲ 0.40 (2.38%)
TRG 61.00 Increased By ▲ 4.96 (8.85%)
UNITY 28.96 Increased By ▲ 0.18 (0.63%)
WTL 1.37 Increased By ▲ 0.02 (1.48%)
BR100 10,786 Increased By 127.6 (1.2%)
BR30 32,266 Increased By 934.6 (2.98%)
KSE100 100,083 Increased By 813.5 (0.82%)
KSE30 31,193 Increased By 160.9 (0.52%)
Business & Finance

NHA plans to build new bridge to connect Karachi with Balochistan

  • Due to recent rains the flood relay damaged the extra support of the bridge pillars.
Published September 22, 2020

The Lasbela Chamber of Commerce has welcomed the announcement of repair of the Hub River Bridge connecting Karachi with Balochistan alongside the construction of a new bridge, which would join Karachi with the province.

As per details, Lasbela Chamber of Commerce President Ismail Sattar said that General Manager of National Highway Authority (NHA) Balochistan South Sham Sundar has informed him about the move in a meeting. He said that according to Sham Sundar, the chairman of NHA has issued orders regarding the plan for the early construction of the new bridge.

He said that the present bridge was constructed in 1962 and it is still usable. Ismail Sattar informed the General Manager NHA that the existing bridge has become inadequate due to the increase in heavy traffic. Furthermore, due to recent rains the flood relay damaged the extra support of the bridge pillars.

Ismail Sattar said there was a serious risk of damage to the bridge if sand mining on both sides of the bridge was not strictly stopped. He said the Lasbela area is the largest regulated industrial area in the province, accounting for more than 75pc of the province's revenue.

Comments

Comments are closed.