AIRLINK 212.82 Increased By ▲ 3.27 (1.56%)
BOP 10.25 Decreased By ▼ -0.21 (-2.01%)
CNERGY 7.00 Decreased By ▼ -0.35 (-4.76%)
FCCL 33.47 Decreased By ▼ -0.92 (-2.68%)
FFL 17.64 Decreased By ▼ -0.41 (-2.27%)
FLYNG 21.82 Decreased By ▼ -1.10 (-4.8%)
HUBC 129.11 Decreased By ▼ -3.38 (-2.55%)
HUMNL 13.86 Decreased By ▼ -0.28 (-1.98%)
KEL 4.86 Decreased By ▼ -0.17 (-3.38%)
KOSM 6.93 Decreased By ▼ -0.14 (-1.98%)
MLCF 43.63 Decreased By ▼ -1.57 (-3.47%)
OGDC 212.95 Decreased By ▼ -5.43 (-2.49%)
PACE 7.22 Decreased By ▼ -0.36 (-4.75%)
PAEL 41.17 Decreased By ▼ -0.53 (-1.27%)
PIAHCLA 16.83 Decreased By ▼ -0.47 (-2.72%)
PIBTL 8.63 Increased By ▲ 0.08 (0.94%)
POWERPS 12.50 No Change ▼ 0.00 (0%)
PPL 183.03 Decreased By ▼ -6.00 (-3.17%)
PRL 39.63 Decreased By ▼ -2.70 (-6.38%)
PTC 24.73 Decreased By ▼ -0.44 (-1.75%)
SEARL 98.01 Decreased By ▼ -5.95 (-5.72%)
SILK 1.01 Decreased By ▼ -0.02 (-1.94%)
SSGC 41.73 Increased By ▲ 2.49 (6.35%)
SYM 18.86 Decreased By ▼ -0.30 (-1.57%)
TELE 9.00 Decreased By ▼ -0.24 (-2.6%)
TPLP 12.40 Decreased By ▼ -0.70 (-5.34%)
TRG 65.68 Decreased By ▼ -3.50 (-5.06%)
WAVESAPP 10.98 Increased By ▲ 0.26 (2.43%)
WTL 1.79 Increased By ▲ 0.08 (4.68%)
YOUW 4.03 Decreased By ▼ -0.11 (-2.66%)
BR100 11,866 Decreased By -213.1 (-1.76%)
BR30 35,697 Decreased By -905.3 (-2.47%)
KSE100 114,148 Decreased By -1904.2 (-1.64%)
KSE30 35,952 Decreased By -625.5 (-1.71%)

Karachi Water and Sewerage Board (KWSB) has decided to file a contempt of court petition against Karachi Electric Supply Company (KESC) for the loadshedding in the name of cable faults being carried out at its pumping stations despite exemption accorded to KWSB's pumping stations from load shedding by the Sindh High Court (SHC).
According to KWSB spokesman here on Sunday, the managing director of KWSB Misbahuddin Farid has directed the legal department to proceed against the KESC. He alleged the KESC has made it a habit for the last one and a half month to resort to hours long load shedding in the name of technical faults at its main pumping stations which created water shortage in the metropolis.
Above all, KESC is releasing misleading statements to the media showing that it was supplying uninterrupted power to the Board and lamenting that KWSB was equally responsible for water shortage.
The spokesman said that KWSB was a service organisation paying electricity tariff as commercial entity to KESC which has raised power tariff from Rs 4.20 per unit to Rs 17 per unit in the last five years. He said KWSB provides water at no profit no loss basis to its consumers and paying its bills regularly to KESC despite losses.
Giving details, he said that KWSB could not supply 320 million gallons per day (MGD) of water from its Dhabeji pumping station due to 70 hours of loadshedding. Similarly, it could not supply 310 MGD water from its Pipri station because of 48 hours load shedding and 120 MGD water from its North East of Karachi due to 40 hours load shedding. The spokesman said that due to 55 hours load shedding, KWSB could not supply 98 MGD of water from its Dhabeji pumping station and 105 MGD from its pumping station at Hub due to 22 hours load shedding.
He said that MD KWSB has advised KESC to give preference to public interest over profitability of the company and try to avoid power cut to KWSB pumping stations so that Karachiites can get required water for their use.

Copyright Associated Press of Pakistan, 2012

Comments

Comments are closed.