AIRLINK 194.83 Decreased By ▼ -3.14 (-1.59%)
BOP 9.81 Decreased By ▼ -0.23 (-2.29%)
CNERGY 7.36 Increased By ▲ 0.07 (0.96%)
FCCL 38.58 Increased By ▲ 2.58 (7.17%)
FFL 16.45 Decreased By ▼ -0.46 (-2.72%)
FLYNG 27.54 Increased By ▲ 2.50 (9.98%)
HUBC 131.75 Decreased By ▼ -2.28 (-1.7%)
HUMNL 13.86 Decreased By ▼ -0.28 (-1.98%)
KEL 4.66 Decreased By ▼ -0.12 (-2.51%)
KOSM 6.66 Decreased By ▼ -0.28 (-4.03%)
MLCF 45.39 Increased By ▲ 0.41 (0.91%)
OGDC 213.99 Decreased By ▼ -4.24 (-1.94%)
PACE 6.86 Decreased By ▼ -0.08 (-1.15%)
PAEL 40.06 Decreased By ▼ -1.36 (-3.28%)
PIAHCLA 16.79 Decreased By ▼ -0.07 (-0.42%)
PIBTL 8.32 Decreased By ▼ -0.14 (-1.65%)
POWER 9.43 Increased By ▲ 0.04 (0.43%)
PPL 182.19 Decreased By ▼ -3.74 (-2.01%)
PRL 41.83 Increased By ▲ 0.56 (1.36%)
PTC 24.56 Decreased By ▼ -0.21 (-0.85%)
SEARL 102.53 Decreased By ▼ -2.12 (-2.03%)
SILK 1.00 Decreased By ▼ -0.01 (-0.99%)
SSGC 39.44 Decreased By ▼ -1.47 (-3.59%)
SYM 17.33 Decreased By ▼ -0.72 (-3.99%)
TELE 8.76 Decreased By ▼ -0.15 (-1.68%)
TPLP 12.75 Decreased By ▼ -0.09 (-0.7%)
TRG 65.40 Decreased By ▼ -1.20 (-1.8%)
WAVESAPP 11.11 Decreased By ▼ -0.19 (-1.68%)
WTL 1.70 Decreased By ▼ -0.08 (-4.49%)
YOUW 3.94 Decreased By ▼ -0.06 (-1.5%)
BR100 11,988 Decreased By -121.3 (-1%)
BR30 36,198 Decreased By -400.2 (-1.09%)
KSE100 113,443 Decreased By -1598.8 (-1.39%)
KSE30 35,635 Decreased By -564.3 (-1.56%)
Pakistan

Asad Umar laid the foundation stone of Shah Allah Ditta, UC-39,46 roads

  • The total funds required for construction of both these roads amounting to Rs. 880 million have been allocated, said a press release issued here.
Published October 29, 2020

ISLAMABAD: Federal Minister for Planning, Development and Special Initiatives Asad Umar laid the foundation stone of Shah Allah Ditta Road, Drake Mohri, Meera Simbal Jafri, UC-39 and Chishtianabad Road, UC-46.

The total funds required for construction of both these roads amounting to Rs. 880 million have been allocated, said a press release issued here.

While addressing the ground breaking ceremony of Shah Allah Ditta Road Drake Mohri Meera Simbal Jafri UC39 Road, Federal Minister Asad Umar said that the three-kilometre Shah Allah Ditta Road Drake will be completed in three months at the cost of Rs. 75 million and the main road will be completed in three months.

He said that this road will not only connect the villages around Shah Allah Ditta but will also help increasing business activities in this area.

Asad Umar also laid the foundation stone of Chishtianabad UC-46 Bhadana road at a cost of Rs. 13 million, which will be completed in two months.

"Both the roads were being built on the demand of local residents, starting work on these roads was one of our top priorities," Asad Umar said.

Talking about the development works in Islamabad, the Federal Minister said that basic infrastructure projects were being launched in the rural areas of NA-54 at a cost of Rs. 850 million in the current financial year with the aim of upgrading the rural areas, to be equipped with full facilities.

He said that another major project of rural area is Shams Colony Road which despite being overcrowded has no main road and previous governments never thought of doing any work on it.

He further said that construction of 200-bed hospital in rural areas, 4 BHUs, construction of polyclinic hospital for NA-54 constituency, construction of over head bridge in front of Jangi Syedan, providing water, transport facility and tourism are included in the master plan of Islamabad.

Implementation of this plan is one of top priorities of the government.

Comments

Comments are closed.