AIRLINK 194.79 Increased By ▲ 1.23 (0.64%)
BOP 10.05 Increased By ▲ 0.10 (1.01%)
CNERGY 7.90 Decreased By ▼ -0.03 (-0.38%)
FCCL 40.24 Decreased By ▼ -0.41 (-1.01%)
FFL 16.99 Increased By ▲ 0.13 (0.77%)
FLYNG 27.20 Decreased By ▼ -0.55 (-1.98%)
HUBC 133.90 Increased By ▲ 1.32 (1%)
HUMNL 14.10 Increased By ▲ 0.21 (1.51%)
KEL 4.65 Increased By ▲ 0.05 (1.09%)
KOSM 6.64 Increased By ▲ 0.02 (0.3%)
MLCF 47.60 No Change ▼ 0.00 (0%)
OGDC 215.30 Increased By ▲ 1.39 (0.65%)
PACE 6.98 Increased By ▲ 0.05 (0.72%)
PAEL 41.97 Increased By ▲ 0.73 (1.77%)
PIAHCLA 17.35 Increased By ▲ 0.20 (1.17%)
PIBTL 8.55 Increased By ▲ 0.14 (1.66%)
POWER 9.60 Decreased By ▼ -0.04 (-0.41%)
PPL 184.33 Increased By ▲ 1.98 (1.09%)
PRL 42.90 Increased By ▲ 0.94 (2.24%)
PTC 25.00 Increased By ▲ 0.10 (0.4%)
SEARL 106.02 Decreased By ▼ -0.82 (-0.77%)
SILK 1.00 Increased By ▲ 0.01 (1.01%)
SSGC 43.42 Increased By ▲ 3.32 (8.28%)
SYM 17.72 Increased By ▲ 0.25 (1.43%)
TELE 8.97 Increased By ▲ 0.13 (1.47%)
TPLP 13.06 Increased By ▲ 0.31 (2.43%)
TRG 67.49 Increased By ▲ 0.54 (0.81%)
WAVESAPP 11.60 Increased By ▲ 0.27 (2.38%)
WTL 1.81 Increased By ▲ 0.02 (1.12%)
YOUW 4.01 Decreased By ▼ -0.06 (-1.47%)
BR100 12,155 Increased By 109.9 (0.91%)
BR30 36,849 Increased By 268.8 (0.73%)
KSE100 114,684 Increased By 646.4 (0.57%)
KSE30 36,053 Increased By 258.5 (0.72%)

KARACHI: President, SITE Association of Industry (SAI), Abdul Hadi has urged Prime Minister Imran Khan to enhance the load limit for SMEs from 70KW to 140KW so that more industries could avail the 50pc reduced tariff on excess electricity consumption.

Also the procedure for approval of excess load from the K-Electric needs to be simplified, he added.

“It is essential to enhance the limit to 140KW so that more and more SMEs could benefit from the announcement made by the Prime Minister of Pakistan which will not only give boost to the SMEs but also open up more avenues for employment besides stabilizing economy of the country”, Abdul Hadi remarked.

Due to removal of peak hours slab, industries will be able to get electricity on 24 hours basis at the same rate and continue industrial production without interruption.

He said that on using excess load by the industry, the same has to be approved by the K-Electric which is not an easy job. As such, the procedure for load enhancement must be simplified and other associated costs like installation of PMTs etc, should also be reduced.

Copyright Business Recorder, 2020

Comments

Comments are closed.