AIRLINK 194.83 Decreased By ▼ -3.14 (-1.59%)
BOP 9.81 Decreased By ▼ -0.23 (-2.29%)
CNERGY 7.36 Increased By ▲ 0.07 (0.96%)
FCCL 38.58 Increased By ▲ 2.58 (7.17%)
FFL 16.45 Decreased By ▼ -0.46 (-2.72%)
FLYNG 27.54 Increased By ▲ 2.50 (9.98%)
HUBC 131.75 Decreased By ▼ -2.28 (-1.7%)
HUMNL 13.86 Decreased By ▼ -0.28 (-1.98%)
KEL 4.66 Decreased By ▼ -0.12 (-2.51%)
KOSM 6.66 Decreased By ▼ -0.28 (-4.03%)
MLCF 45.39 Increased By ▲ 0.41 (0.91%)
OGDC 213.99 Decreased By ▼ -4.24 (-1.94%)
PACE 6.86 Decreased By ▼ -0.08 (-1.15%)
PAEL 40.06 Decreased By ▼ -1.36 (-3.28%)
PIAHCLA 16.79 Decreased By ▼ -0.07 (-0.42%)
PIBTL 8.32 Decreased By ▼ -0.14 (-1.65%)
POWER 9.43 Increased By ▲ 0.04 (0.43%)
PPL 182.19 Decreased By ▼ -3.74 (-2.01%)
PRL 41.83 Increased By ▲ 0.56 (1.36%)
PTC 24.56 Decreased By ▼ -0.21 (-0.85%)
SEARL 102.53 Decreased By ▼ -2.12 (-2.03%)
SILK 1.00 Decreased By ▼ -0.01 (-0.99%)
SSGC 39.44 Decreased By ▼ -1.47 (-3.59%)
SYM 17.33 Decreased By ▼ -0.72 (-3.99%)
TELE 8.76 Decreased By ▼ -0.15 (-1.68%)
TPLP 12.75 Decreased By ▼ -0.09 (-0.7%)
TRG 65.40 Decreased By ▼ -1.20 (-1.8%)
WAVESAPP 11.11 Decreased By ▼ -0.19 (-1.68%)
WTL 1.70 Decreased By ▼ -0.08 (-4.49%)
YOUW 3.94 Decreased By ▼ -0.06 (-1.5%)
BR100 11,988 Decreased By -121.3 (-1%)
BR30 36,198 Decreased By -400.2 (-1.09%)
KSE100 113,443 Decreased By -1598.8 (-1.39%)
KSE30 35,635 Decreased By -564.3 (-1.56%)

ISLAMABAD: National Energy and Efficiency and Conservation Authority (NEECA) has offered 50 percent energy audit free of cost to Captive Power Plants (CPPs) on first-come-first-served basis.

In a reminder to the companies, NEECA Managing Director Dr Sardar Moazzam has stated that it is significant to indicate that as per the directions of the Cabinet Committee on Energy (CCoE), Petroleum Division conveyed on July 30, 2020 that NEECA has been assigned the task of conducting energy audits of gas based captive power units.

And emphasized that the advertisement for "Request for Proposal" for Energy Audits of Gas Based Captive Power Plants (CPPs) as identified by SNGPL and SSGC through private Engineering Consulting Firms was published in the newspapers on August 15, 2020.

NEECA has already communicated to share the possible date and time along with the technical information of the respective CPPs but no response in this regard has so far been received. He advised CPPs once again to indicate date and time as well as required technical information for preliminary assessment by October30, 2020. In case of non-compliance, the RLNG rates would be applied from January 1, 2021.

He maintained that conduct of Energy Audits for the CPPs is mandatory for the zero rated sectors including textile sector and the RING rates will be applicable to all the non-conforming CCPs by June 18, 2021.

Copyright Business Recorder, 2020

Comments

Comments are closed.