AGL 40.15 Increased By ▲ 0.14 (0.35%)
AIRLINK 127.20 Increased By ▲ 0.20 (0.16%)
BOP 6.79 Increased By ▲ 0.10 (1.49%)
CNERGY 4.53 Increased By ▲ 0.02 (0.44%)
DCL 8.64 No Change ▼ 0.00 (0%)
DFML 40.94 Decreased By ▼ -0.10 (-0.24%)
DGKC 85.90 Increased By ▲ 0.29 (0.34%)
FCCL 33.04 Decreased By ▼ -0.07 (-0.21%)
FFBL 66.68 Increased By ▲ 0.58 (0.88%)
FFL 11.44 Decreased By ▼ -0.11 (-0.95%)
HUBC 111.20 Increased By ▲ 0.09 (0.08%)
HUMNL 14.77 Decreased By ▼ -0.05 (-0.34%)
KEL 5.15 Decreased By ▼ -0.02 (-0.39%)
KOSM 7.61 Decreased By ▼ -0.05 (-0.65%)
MLCF 40.15 Decreased By ▼ -0.06 (-0.15%)
NBP 60.88 Increased By ▲ 0.37 (0.61%)
OGDC 194.41 Increased By ▲ 0.31 (0.16%)
PAEL 26.99 Increased By ▲ 0.27 (1.01%)
PIBTL 7.60 Increased By ▲ 0.23 (3.12%)
PPL 154.00 Increased By ▲ 0.21 (0.14%)
PRL 26.22 Increased By ▲ 0.01 (0.04%)
PTC 17.61 Increased By ▲ 0.43 (2.5%)
SEARL 85.30 Decreased By ▼ -0.30 (-0.35%)
TELE 7.76 Increased By ▲ 0.19 (2.51%)
TOMCL 33.90 Decreased By ▼ -0.49 (-1.42%)
TPLP 9.57 Increased By ▲ 0.75 (8.5%)
TREET 16.89 Increased By ▲ 0.07 (0.42%)
TRG 62.75 Increased By ▲ 0.20 (0.32%)
UNITY 27.42 Increased By ▲ 0.13 (0.48%)
WTL 1.32 Increased By ▲ 0.02 (1.54%)
BR100 10,153 Increased By 41.9 (0.41%)
BR30 31,267 Increased By 79.3 (0.25%)
KSE100 95,530 Increased By 534.7 (0.56%)
KSE30 29,656 Increased By 174.8 (0.59%)

KARACHI: Administrator Karachi Laeeq Ahmed on Monday said that road construction and renovation is being carried out in Clifton and Schon circle to make them properly motorable. Around 25,000 square feet road is being renovated at side road of Clifton underpass and Schon Circle which would facilitate the people and traders.

New works would be initiated after fixing issues of current infrastructure, the Administrator passed these remarks while reviewing works at Schon Circle and Clifton. The Administrator said that side road of Clifton was in deplorable condition and the people were facing hardships. This is one of the busiest roads that's why it is being renovated. Besides, Schon Circle and adjacent roads were also reconstructed.

Ahmed directed Director General Works Shabeeh ul Hassan Zaidi to carryout other related works besides construction of the roads. The works should be carried out on urgent basis where necessary. The Administrator said that works are underway across the city. He said that Karachi Metropolitan Corporation is carrying out all these works from its own expenses.

He said that many roads were constructed and renovated in different areas including 60,000 square feet road from Ghareebabad to Hussainabad, Abul Hassan Isfahani Road, Shahrah-e-Pakistan, Nazimabad, Site area, Essa Nagri, Liaquatabad No.10, Olympian Islahuddin Road and Allama Shabbir Ahmed Road. Besides road construction, street lights are also being repaired. He said that in all these works, use of standard material was ensured for long lasting results.

Copyright Business Recorder, 2020

Comments

Comments are closed.