AGL 40.00 No Change ▼ 0.00 (0%)
AIRLINK 129.06 Decreased By ▼ -0.47 (-0.36%)
BOP 6.75 Increased By ▲ 0.07 (1.05%)
CNERGY 4.49 Decreased By ▼ -0.14 (-3.02%)
DCL 8.55 Decreased By ▼ -0.39 (-4.36%)
DFML 40.82 Decreased By ▼ -0.87 (-2.09%)
DGKC 80.96 Decreased By ▼ -2.81 (-3.35%)
FCCL 32.77 No Change ▼ 0.00 (0%)
FFBL 74.43 Decreased By ▼ -1.04 (-1.38%)
FFL 11.74 Increased By ▲ 0.27 (2.35%)
HUBC 109.58 Decreased By ▼ -0.97 (-0.88%)
HUMNL 13.75 Decreased By ▼ -0.81 (-5.56%)
KEL 5.31 Decreased By ▼ -0.08 (-1.48%)
KOSM 7.72 Decreased By ▼ -0.68 (-8.1%)
MLCF 38.60 Decreased By ▼ -1.19 (-2.99%)
NBP 63.51 Increased By ▲ 3.22 (5.34%)
OGDC 194.69 Decreased By ▼ -4.97 (-2.49%)
PAEL 25.71 Decreased By ▼ -0.94 (-3.53%)
PIBTL 7.39 Decreased By ▼ -0.27 (-3.52%)
PPL 155.45 Decreased By ▼ -2.47 (-1.56%)
PRL 25.79 Decreased By ▼ -0.94 (-3.52%)
PTC 17.50 Decreased By ▼ -0.96 (-5.2%)
SEARL 78.65 Decreased By ▼ -3.79 (-4.6%)
TELE 7.86 Decreased By ▼ -0.45 (-5.42%)
TOMCL 33.73 Decreased By ▼ -0.78 (-2.26%)
TPLP 8.40 Decreased By ▼ -0.66 (-7.28%)
TREET 16.27 Decreased By ▼ -1.20 (-6.87%)
TRG 58.22 Decreased By ▼ -3.10 (-5.06%)
UNITY 27.49 Increased By ▲ 0.06 (0.22%)
WTL 1.39 Increased By ▲ 0.01 (0.72%)
BR100 10,445 Increased By 38.5 (0.37%)
BR30 31,189 Decreased By -523.9 (-1.65%)
KSE100 97,798 Increased By 469.8 (0.48%)
KSE30 30,481 Increased By 288.3 (0.95%)
Pakistan Print 2020-12-31

Korangi, Nazimabad: KE removes illegal kunda connections

KARACHI: K-Electric (KE) continued its drive against illegal connections across Karachi. In Korangi, KE...
Published December 31, 2020

KARACHI: K-Electric (KE) continued its drive against illegal connections across Karachi.

In Korangi, KE successfully removed over 2,000 illegal hook connections from KDA Employees Society. An illegal underground network was also dismantled which was used for water boring from Jalalabad in Nazimabad.

The illegal connections, or kundas, weighing 1,700 kilograms, were taken down despite resistance from the local kunda mafia. The un-permitted connections, which are hazardous and pose a danger to the surrounding area, were placed onto Aerial Bundled Cables (ABC) located within the industrial area of Korangi.

In a separate drive in Jalalabad, located in Nazimabad, KE teams removed illegal underground and overhead cables weighing 232 kilograms, along with unauthorized electrical equipment. Approximately 62 kW electrical loads were used for illegal water boring in the area. Notices have been served to the culprits involved. According to KE spokesperson, “Illegal connections and encroachments around power infrastructure are major public safety hazards.” —PR

Copyright Business Recorder, 2020

Comments

Comments are closed.