AIRLINK 195.04 Increased By ▲ 0.21 (0.11%)
BOP 9.82 Increased By ▲ 0.01 (0.1%)
CNERGY 7.42 Increased By ▲ 0.06 (0.82%)
FCCL 40.35 Increased By ▲ 1.77 (4.59%)
FFL 16.38 Decreased By ▼ -0.07 (-0.43%)
FLYNG 28.62 Increased By ▲ 1.08 (3.92%)
HUBC 132.80 Increased By ▲ 1.05 (0.8%)
HUMNL 13.94 Increased By ▲ 0.08 (0.58%)
KEL 4.60 Decreased By ▼ -0.06 (-1.29%)
KOSM 6.65 Decreased By ▼ -0.01 (-0.15%)
MLCF 46.30 Increased By ▲ 0.91 (2%)
OGDC 214.80 Increased By ▲ 0.81 (0.38%)
PACE 6.84 Decreased By ▼ -0.02 (-0.29%)
PAEL 40.55 Increased By ▲ 0.49 (1.22%)
PIAHCLA 17.40 Increased By ▲ 0.61 (3.63%)
PIBTL 8.42 Increased By ▲ 0.10 (1.2%)
POWER 9.72 Increased By ▲ 0.29 (3.08%)
PPL 183.50 Increased By ▲ 1.31 (0.72%)
PRL 42.19 Increased By ▲ 0.36 (0.86%)
PTC 24.87 Increased By ▲ 0.31 (1.26%)
SEARL 104.20 Increased By ▲ 1.67 (1.63%)
SILK 1.00 No Change ▼ 0.00 (0%)
SSGC 40.18 Increased By ▲ 0.74 (1.88%)
SYM 17.37 Increased By ▲ 0.04 (0.23%)
TELE 8.74 Decreased By ▼ -0.02 (-0.23%)
TPLP 12.71 Decreased By ▼ -0.04 (-0.31%)
TRG 66.23 Increased By ▲ 0.83 (1.27%)
WAVESAPP 11.16 Increased By ▲ 0.05 (0.45%)
WTL 1.71 Increased By ▲ 0.01 (0.59%)
YOUW 3.96 Increased By ▲ 0.02 (0.51%)
BR100 12,027 Increased By 53.1 (0.44%)
BR30 36,465 Increased By 318.9 (0.88%)
KSE100 113,739 Increased By 295.2 (0.26%)
KSE30 35,747 Increased By 111.2 (0.31%)

KARACHI: For augmenting gas supply to a number of areas in DHA and Clifton, Karachi, SSGC is working full throttle on laying a 7 kms long, 20 inch diameter gas pipeline that would transport gas from the site of Dolmen Mall Clifton (DMC) to the DHA Water Desalination Plant.

This 20” dia pipeline is midway through its completion phase. It will normalize and improve the gas supply and pressure related issues being faced by the residents of DHA and areas surrounding DMC. SSGC engineers and technicians are leaving no stone unturned to complete the pipeline soon. Within a record span of just 20 days, the Company’s diligent team of Project and Construction Department has been able to lay down 3 kms of this pipeline.

Once the pipeline is laid, SSGC is confident that the Company will be able to bridge the current gas related issues in the areas of DHA and Clifton.

SSGC continues to pursue its unfaltering commitment by serving its over 3 million valued customers with a smile while ensuring them uninterrupted supplies of gas in its franchise provinces of Sindh and Balochistan.—PR

Copyright Business Recorder, 2021

Comments

Comments are closed.