AGL 40.21 Increased By ▲ 0.18 (0.45%)
AIRLINK 127.64 Decreased By ▼ -0.06 (-0.05%)
BOP 6.67 Increased By ▲ 0.06 (0.91%)
CNERGY 4.45 Decreased By ▼ -0.15 (-3.26%)
DCL 8.73 Decreased By ▼ -0.06 (-0.68%)
DFML 41.16 Decreased By ▼ -0.42 (-1.01%)
DGKC 86.11 Increased By ▲ 0.32 (0.37%)
FCCL 32.56 Increased By ▲ 0.07 (0.22%)
FFBL 64.38 Increased By ▲ 0.35 (0.55%)
FFL 11.61 Increased By ▲ 1.06 (10.05%)
HUBC 112.46 Increased By ▲ 1.69 (1.53%)
HUMNL 14.81 Decreased By ▼ -0.26 (-1.73%)
KEL 5.04 Increased By ▲ 0.16 (3.28%)
KOSM 7.36 Decreased By ▼ -0.09 (-1.21%)
MLCF 40.33 Decreased By ▼ -0.19 (-0.47%)
NBP 61.08 Increased By ▲ 0.03 (0.05%)
OGDC 194.18 Decreased By ▼ -0.69 (-0.35%)
PAEL 26.91 Decreased By ▼ -0.60 (-2.18%)
PIBTL 7.28 Decreased By ▼ -0.53 (-6.79%)
PPL 152.68 Increased By ▲ 0.15 (0.1%)
PRL 26.22 Decreased By ▼ -0.36 (-1.35%)
PTC 16.14 Decreased By ▼ -0.12 (-0.74%)
SEARL 85.70 Increased By ▲ 1.56 (1.85%)
TELE 7.67 Decreased By ▼ -0.29 (-3.64%)
TOMCL 36.47 Decreased By ▼ -0.13 (-0.36%)
TPLP 8.79 Increased By ▲ 0.13 (1.5%)
TREET 16.84 Decreased By ▼ -0.82 (-4.64%)
TRG 62.74 Increased By ▲ 4.12 (7.03%)
UNITY 28.20 Increased By ▲ 1.34 (4.99%)
WTL 1.34 Decreased By ▼ -0.04 (-2.9%)
BR100 10,086 Increased By 85.5 (0.85%)
BR30 31,170 Increased By 168.1 (0.54%)
KSE100 94,764 Increased By 571.8 (0.61%)
KSE30 29,410 Increased By 209 (0.72%)

KARACHI: Rehabilitation work on 25-kilometer railway track connecting the strategic Karachi Port Trust (KPT) with the City Station under ‘KPT Railways connectivity project’ is underway in full swing.

Once completed, the project will sow the seeds of economic prosperity to the already ailing public entity, said the newly appointed divisional superintendent (DS) Karachi Muhammad Hanif Gul during his visit to the KPT connectivity project along with PD KPT connectivity Riaz Ali Laghari and Deputy DS (Infrastructure) Shoukat Shaikh.

The DS said, “Besides significant surge in the volume of freight earnings, the project will massively ease out traffic congestion when it becomes operational,”

He said that the conclusion of the KPT railways connectivity project would not only bring an economic boon for Pakistan Railways but a new era of progress and prosperity would be ushered in also.

He was briefed by Project Director of KPT connectivity project that aims at rehabilitation of 25 kilometres of railways track connecting Karachi Port Trust with Karachi City station entailing 12 level crossings, various yards and 2 bridges enroute.

The DS also visited the Wazir Mansion station, a major container loading point, and was comprehensively briefed regarding the operational parameters by the concerned divisional officers.

Copyright Business Recorder, 2021

Comments

Comments are closed.