AGL 38.20 Increased By ▲ 0.05 (0.13%)
AIRLINK 129.30 Increased By ▲ 4.23 (3.38%)
BOP 7.85 Increased By ▲ 1.00 (14.6%)
CNERGY 4.66 Increased By ▲ 0.21 (4.72%)
DCL 8.35 Increased By ▲ 0.44 (5.56%)
DFML 38.86 Increased By ▲ 1.52 (4.07%)
DGKC 82.20 Increased By ▲ 4.43 (5.7%)
FCCL 33.64 Increased By ▲ 3.06 (10.01%)
FFBL 75.75 Increased By ▲ 6.89 (10.01%)
FFL 12.83 Increased By ▲ 0.97 (8.18%)
HUBC 110.72 Increased By ▲ 6.22 (5.95%)
HUMNL 14.03 Increased By ▲ 0.54 (4%)
KEL 5.22 Increased By ▲ 0.57 (12.26%)
KOSM 7.69 Increased By ▲ 0.52 (7.25%)
MLCF 40.08 Increased By ▲ 3.64 (9.99%)
NBP 72.51 Increased By ▲ 6.59 (10%)
OGDC 189.18 Increased By ▲ 9.65 (5.38%)
PAEL 25.74 Increased By ▲ 1.31 (5.36%)
PIBTL 7.38 Increased By ▲ 0.23 (3.22%)
PPL 153.45 Increased By ▲ 9.75 (6.78%)
PRL 25.52 Increased By ▲ 1.20 (4.93%)
PTC 17.92 Increased By ▲ 1.52 (9.27%)
SEARL 82.50 Increased By ▲ 3.93 (5%)
TELE 7.63 Increased By ▲ 0.41 (5.68%)
TOMCL 32.50 Increased By ▲ 0.53 (1.66%)
TPLP 8.48 Increased By ▲ 0.35 (4.31%)
TREET 16.74 Increased By ▲ 0.61 (3.78%)
TRG 56.01 Increased By ▲ 1.35 (2.47%)
UNITY 28.85 Increased By ▲ 1.35 (4.91%)
WTL 1.34 Increased By ▲ 0.05 (3.88%)
BR100 10,659 Increased By 569.2 (5.64%)
BR30 31,331 Increased By 1822.5 (6.18%)
KSE100 99,269 Increased By 4695.1 (4.96%)
KSE30 31,032 Increased By 1587.6 (5.39%)
Business & Finance

5,340 MW of electricity added to grid under CPEC power projects

  • Out of a total of 22 projects, another eight are near completion and would pump in an additional 4,470 MW of electricity to the national grid.
Published February 23, 2021

In order to meet the country’s energy needs, nine power projects have to date been completed under the China Pakistan Economic Corridor (CPEC) initiative, which is an important cog of China’s ambitious Belt and Road Initiative.

As per Radio Pakistan, these power projects have generated 5,340 MW of electricity, which has been added to the main grid.

It informed that out of a total of 22 projects, another eight are near completion and would pump in an additional 4,470 MW of electricity to the national grid. Whereas, another five projects are in the planning and implementation phase.

Despite the uncertainties brought by the coronavirus pandemic, the work on CPEC related projects has continued uninterrupted.

Over the past five years, there were 22 construction projects under the framework of CPEC, covering roads, railways, airports, thermal power, hydropower, renewable energy, Gwadar Port, special economic zones and other areas.

"In face of the novel coronavirus, all CPEC projects have been moving forward, bringing hope for a future of peace and economic growth," stated Chairman of the CPEC Authority Asim Bajwa back in December.

He said that infrastructure investment and construction would be a key to reviving the jobs market and national economies. "Under CPEC, no project has been suspended for construction, and no worker has been laid off," he told the gathering via video from Islamabad.

Comments

Comments are closed.