AGL 40.21 Increased By ▲ 0.18 (0.45%)
AIRLINK 127.64 Decreased By ▼ -0.06 (-0.05%)
BOP 6.67 Increased By ▲ 0.06 (0.91%)
CNERGY 4.45 Decreased By ▼ -0.15 (-3.26%)
DCL 8.73 Decreased By ▼ -0.06 (-0.68%)
DFML 41.16 Decreased By ▼ -0.42 (-1.01%)
DGKC 86.11 Increased By ▲ 0.32 (0.37%)
FCCL 32.56 Increased By ▲ 0.07 (0.22%)
FFBL 64.38 Increased By ▲ 0.35 (0.55%)
FFL 11.61 Increased By ▲ 1.06 (10.05%)
HUBC 112.46 Increased By ▲ 1.69 (1.53%)
HUMNL 14.81 Decreased By ▼ -0.26 (-1.73%)
KEL 5.04 Increased By ▲ 0.16 (3.28%)
KOSM 7.36 Decreased By ▼ -0.09 (-1.21%)
MLCF 40.33 Decreased By ▼ -0.19 (-0.47%)
NBP 61.08 Increased By ▲ 0.03 (0.05%)
OGDC 194.18 Decreased By ▼ -0.69 (-0.35%)
PAEL 26.91 Decreased By ▼ -0.60 (-2.18%)
PIBTL 7.28 Decreased By ▼ -0.53 (-6.79%)
PPL 152.68 Increased By ▲ 0.15 (0.1%)
PRL 26.22 Decreased By ▼ -0.36 (-1.35%)
PTC 16.14 Decreased By ▼ -0.12 (-0.74%)
SEARL 85.70 Increased By ▲ 1.56 (1.85%)
TELE 7.67 Decreased By ▼ -0.29 (-3.64%)
TOMCL 36.47 Decreased By ▼ -0.13 (-0.36%)
TPLP 8.79 Increased By ▲ 0.13 (1.5%)
TREET 16.84 Decreased By ▼ -0.82 (-4.64%)
TRG 62.74 Increased By ▲ 4.12 (7.03%)
UNITY 28.20 Increased By ▲ 1.34 (4.99%)
WTL 1.34 Decreased By ▼ -0.04 (-2.9%)
BR100 10,086 Increased By 85.5 (0.85%)
BR30 31,170 Increased By 168.1 (0.54%)
KSE100 94,764 Increased By 571.8 (0.61%)
KSE30 29,410 Increased By 209 (0.72%)
Pakistan Print 2021-02-24

Wapda to rehabilitate Rasul Hydel Power Station

RECORDER REPORt LAHORE: The Pakistan Water and Power Development Authority (Wapda) has planned to rehabilitate...
Published February 24, 2021

RECORDER REPORt

LAHORE: The Pakistan Water and Power Development Authority (Wapda) has planned to rehabilitate 69-year-old Rasul Hydel Power Station located at a link between Upper Jhelum and Lower Jhelum Canals near Khokhra Head Works in Mandi Bahauddin district of Punjab.

Rasul Hydel Power Station was commissioned in 1952 with an installed capacity of 22 megawatt (MW). It was the biggest hydel power project of Pakistan that was commissioned after independence. Since its commissioning, the Hydel Power Station has contributed about 5.5 billion units of low-cost, clean, green and environment-friendly electricity to the national grid. The reduced efficiency of the equipment due to obsolete technology and aging factor has necessitated rehabilitation of the Hydel Power Station to regain and increase its generation capacity. An in-house feasibility study has been completed to proceed further to implement rehabilitation of Rasul Hydel Power Station.

This was crux of a briefing made to Wapda Chairman Lt Gen Muzammil Hussain (retd) during his visit to Rasul Hydel Power Station on Tuesday. Mangla Hydel Power Station Chief Engineer, Rasul Hydel Power Station Resident Engineer and other officials were also present on the occasion. Highlighting the significance of hydel electricity in stabilizing the power tariff and facilitating socio-economic uplift of the country, the chairman said the Wapda has been implementing a two-pronged plan for making optimal utilization of hydro resources in Pakistan. On one hand, we have been constructing new projects including Mohmand, Diamer Basha and Dasu, while on the other hand, also rehabilitating our aged hydel power stations like Mangla, Warsak and Rasul to improve hydel ratio in the system under the plan, he added. Earlier, the chairman visited the power station and allied components including spillway and head gates. He also planted a tree during the visit.

Copyright Business Recorder, 2021

Comments

Comments are closed.