AGL 38.54 Increased By ▲ 0.97 (2.58%)
AIRLINK 129.50 Decreased By ▼ -3.00 (-2.26%)
BOP 5.61 Decreased By ▼ -0.03 (-0.53%)
CNERGY 3.86 Increased By ▲ 0.09 (2.39%)
DCL 8.73 Decreased By ▼ -0.14 (-1.58%)
DFML 41.76 Increased By ▲ 0.76 (1.85%)
DGKC 88.30 Decreased By ▼ -1.86 (-2.06%)
FCCL 35.00 Decreased By ▼ -0.08 (-0.23%)
FFBL 67.35 Increased By ▲ 0.85 (1.28%)
FFL 10.61 Increased By ▲ 0.46 (4.53%)
HUBC 108.76 Increased By ▲ 2.36 (2.22%)
HUMNL 14.66 Increased By ▲ 1.26 (9.4%)
KEL 4.75 Decreased By ▼ -0.11 (-2.26%)
KOSM 6.95 Increased By ▲ 0.10 (1.46%)
MLCF 41.65 Decreased By ▼ -0.15 (-0.36%)
NBP 59.60 Increased By ▲ 1.02 (1.74%)
OGDC 183.00 Increased By ▲ 1.75 (0.97%)
PAEL 26.25 Increased By ▲ 0.55 (2.14%)
PIBTL 5.97 Increased By ▲ 0.14 (2.4%)
PPL 146.70 Decreased By ▼ -1.70 (-1.15%)
PRL 23.61 Increased By ▲ 0.39 (1.68%)
PTC 16.56 Increased By ▲ 1.32 (8.66%)
SEARL 68.30 Decreased By ▼ -0.49 (-0.71%)
TELE 7.23 Decreased By ▼ -0.01 (-0.14%)
TOMCL 35.95 Decreased By ▼ -0.05 (-0.14%)
TPLP 7.85 Increased By ▲ 0.45 (6.08%)
TREET 14.20 Decreased By ▼ -0.04 (-0.28%)
TRG 50.45 Decreased By ▼ -0.40 (-0.79%)
UNITY 26.75 Increased By ▲ 0.35 (1.33%)
WTL 1.21 No Change ▼ 0.00 (0%)
BR100 9,806 Increased By 37.8 (0.39%)
BR30 29,678 Increased By 278.1 (0.95%)
KSE100 92,304 Increased By 366.3 (0.4%)
KSE30 28,840 Increased By 96.6 (0.34%)

LAHORE: Subsequent to successful completion of the annual maintenance, Neelum Jhelum Hydropower Plant (NJHP) resumed electricity generation, as it was synchronized with the National Grid last night.

National Power Control Center (NPCC) had allowed shut down to National Transmission and Dispatch Company (NTDC) on February 28 onwards for maintenance of its 525 KV Rawat and Naukar Transmission Lines during the low flow season to minimize the generation losses.

Accordingly taking advantage of this shutdown, NJHP Company also planned annual maintenance of its Power House Complex generating units besides maintenance of water regulation related sensitive mechanical and electrical equipment and instruments at Dam site. NTDC and NJHP Company successfully completed the annual maintenance of the transmission lines and the plant within stipulated time. Thereafter, NJHP went into operation last night.

Copyright Business Recorder, 2021

Comments

Comments are closed.