AGL 40.00 Decreased By ▼ -0.16 (-0.4%)
AIRLINK 129.53 Decreased By ▼ -2.20 (-1.67%)
BOP 6.68 Decreased By ▼ -0.01 (-0.15%)
CNERGY 4.63 Increased By ▲ 0.16 (3.58%)
DCL 8.94 Increased By ▲ 0.12 (1.36%)
DFML 41.69 Increased By ▲ 1.08 (2.66%)
DGKC 83.77 Decreased By ▼ -0.31 (-0.37%)
FCCL 32.77 Increased By ▲ 0.43 (1.33%)
FFBL 75.47 Increased By ▲ 6.86 (10%)
FFL 11.47 Increased By ▲ 0.12 (1.06%)
HUBC 110.55 Decreased By ▼ -1.21 (-1.08%)
HUMNL 14.56 Increased By ▲ 0.25 (1.75%)
KEL 5.39 Increased By ▲ 0.17 (3.26%)
KOSM 8.40 Decreased By ▼ -0.58 (-6.46%)
MLCF 39.79 Increased By ▲ 0.36 (0.91%)
NBP 60.29 No Change ▼ 0.00 (0%)
OGDC 199.66 Increased By ▲ 4.72 (2.42%)
PAEL 26.65 Decreased By ▼ -0.04 (-0.15%)
PIBTL 7.66 Increased By ▲ 0.18 (2.41%)
PPL 157.92 Increased By ▲ 2.15 (1.38%)
PRL 26.73 Increased By ▲ 0.05 (0.19%)
PTC 18.46 Increased By ▲ 0.16 (0.87%)
SEARL 82.44 Decreased By ▼ -0.58 (-0.7%)
TELE 8.31 Increased By ▲ 0.08 (0.97%)
TOMCL 34.51 Decreased By ▼ -0.04 (-0.12%)
TPLP 9.06 Increased By ▲ 0.25 (2.84%)
TREET 17.47 Increased By ▲ 0.77 (4.61%)
TRG 61.32 Decreased By ▼ -1.13 (-1.81%)
UNITY 27.43 Decreased By ▼ -0.01 (-0.04%)
WTL 1.38 Increased By ▲ 0.10 (7.81%)
BR100 10,407 Increased By 220 (2.16%)
BR30 31,713 Increased By 377.1 (1.2%)
KSE100 97,328 Increased By 1781.9 (1.86%)
KSE30 30,192 Increased By 614.4 (2.08%)

OSLO: Britain and Norway have finished laying the world's longest subsea power cable, which will send wind and hydro energy between the two countries, Norwegian power grid operator Statnett announced Tuesday. The 720-kilometre-long (447-mile-long) North Sea Link - all but four kilometres of it underwater - links Suldal in the southwest of the Scandinavian country to Blyth, near Newcastle.

The cable will deliver British wind energy to Norway, which will send hydropower to the UK in return, with testing set to start October 1.

The project is estimated to have cost between 1.5 billion and 2.0 billion euros ($1.8-$2.4 billion).

"When the wind blows in England and wind power production is high, we in Norway will be able to buy cheap electricity from the British and leave the water in our dam reservoirs," said Statnett's project manager Thor Anders Nummedal.

"When there is little wind and a greater need for electricity in England, they will in turn be able to buy hydroelectric power from us," he said in a statement.

The power capacity of the new cable is 1,400 megawatts.

The coupling of the two sections, built simultaneously from the British and Norwegian sides, took place late Monday evening.

The construction had its share of technical challenges, including the need to build a special barge to run the cable under a Norwegian lake and the drilling of a 2.3-kilometre tunnel.

Comments

Comments are closed.