AGL 38.02 Increased By ▲ 0.08 (0.21%)
AIRLINK 197.36 Increased By ▲ 3.45 (1.78%)
BOP 9.54 Increased By ▲ 0.22 (2.36%)
CNERGY 5.91 Increased By ▲ 0.07 (1.2%)
DCL 8.82 Increased By ▲ 0.14 (1.61%)
DFML 35.74 Decreased By ▼ -0.72 (-1.97%)
DGKC 96.86 Increased By ▲ 4.32 (4.67%)
FCCL 35.25 Increased By ▲ 1.28 (3.77%)
FFBL 88.94 Increased By ▲ 6.64 (8.07%)
FFL 13.17 Increased By ▲ 0.42 (3.29%)
HUBC 127.55 Increased By ▲ 6.94 (5.75%)
HUMNL 13.50 Decreased By ▼ -0.10 (-0.74%)
KEL 5.32 Increased By ▲ 0.10 (1.92%)
KOSM 7.00 Increased By ▲ 0.48 (7.36%)
MLCF 44.70 Increased By ▲ 2.59 (6.15%)
NBP 61.42 Increased By ▲ 1.61 (2.69%)
OGDC 214.67 Increased By ▲ 3.50 (1.66%)
PAEL 38.79 Increased By ▲ 1.21 (3.22%)
PIBTL 8.25 Increased By ▲ 0.18 (2.23%)
PPL 193.08 Increased By ▲ 2.76 (1.45%)
PRL 38.66 Increased By ▲ 0.49 (1.28%)
PTC 25.80 Increased By ▲ 2.35 (10.02%)
SEARL 103.60 Increased By ▲ 5.66 (5.78%)
TELE 8.30 Increased By ▲ 0.08 (0.97%)
TOMCL 35.00 Decreased By ▼ -0.03 (-0.09%)
TPLP 13.30 Decreased By ▼ -0.25 (-1.85%)
TREET 22.16 Decreased By ▼ -0.57 (-2.51%)
TRG 55.59 Increased By ▲ 2.72 (5.14%)
UNITY 32.97 Increased By ▲ 0.01 (0.03%)
WTL 1.60 Increased By ▲ 0.08 (5.26%)
BR100 11,727 Increased By 342.7 (3.01%)
BR30 36,377 Increased By 1165.1 (3.31%)
KSE100 109,513 Increased By 3238.2 (3.05%)
KSE30 34,513 Increased By 1160.1 (3.48%)

OSLO: Britain and Norway have finished laying the world's longest subsea power cable, which will send wind and hydro energy between the two countries, Norwegian power grid operator Statnett announced Tuesday. The 720-kilometre-long (447-mile-long) North Sea Link - all but four kilometres of it underwater - links Suldal in the southwest of the Scandinavian country to Blyth, near Newcastle.

The cable will deliver British wind energy to Norway, which will send hydropower to the UK in return, with testing set to start October 1.

The project is estimated to have cost between 1.5 billion and 2.0 billion euros ($1.8-$2.4 billion).

"When the wind blows in England and wind power production is high, we in Norway will be able to buy cheap electricity from the British and leave the water in our dam reservoirs," said Statnett's project manager Thor Anders Nummedal.

"When there is little wind and a greater need for electricity in England, they will in turn be able to buy hydroelectric power from us," he said in a statement.

The power capacity of the new cable is 1,400 megawatts.

The coupling of the two sections, built simultaneously from the British and Norwegian sides, took place late Monday evening.

The construction had its share of technical challenges, including the need to build a special barge to run the cable under a Norwegian lake and the drilling of a 2.3-kilometre tunnel.

Comments

Comments are closed.