AGL 38.00 Decreased By ▼ -0.48 (-1.25%)
AIRLINK 191.00 Decreased By ▼ -12.02 (-5.92%)
BOP 9.21 Decreased By ▼ -0.96 (-9.44%)
CNERGY 5.83 Decreased By ▼ -0.71 (-10.86%)
DCL 8.60 Decreased By ▼ -0.98 (-10.23%)
DFML 36.20 Decreased By ▼ -3.82 (-9.55%)
DGKC 92.00 Decreased By ▼ -6.08 (-6.2%)
FCCL 33.90 Decreased By ▼ -1.06 (-3.03%)
FFBL 83.50 Decreased By ▼ -2.93 (-3.39%)
FFL 12.60 Decreased By ▼ -1.30 (-9.35%)
HUBC 119.01 Decreased By ▼ -12.56 (-9.55%)
HUMNL 13.50 Decreased By ▼ -0.52 (-3.71%)
KEL 5.20 Decreased By ▼ -0.41 (-7.31%)
KOSM 6.35 Decreased By ▼ -0.92 (-12.65%)
MLCF 42.00 Decreased By ▼ -3.59 (-7.87%)
NBP 59.74 Decreased By ▼ -6.64 (-10%)
OGDC 209.55 Decreased By ▼ -11.21 (-5.08%)
PAEL 36.75 Decreased By ▼ -1.73 (-4.5%)
PIBTL 8.01 Decreased By ▼ -0.90 (-10.1%)
PPL 188.10 Decreased By ▼ -9.78 (-4.94%)
PRL 37.65 Decreased By ▼ -1.38 (-3.54%)
PTC 23.20 Decreased By ▼ -2.27 (-8.91%)
SEARL 97.00 Decreased By ▼ -6.05 (-5.87%)
TELE 8.15 Decreased By ▼ -0.87 (-9.65%)
TOMCL 35.16 Decreased By ▼ -1.25 (-3.43%)
TPLP 13.47 Decreased By ▼ -0.28 (-2.04%)
TREET 22.61 Decreased By ▼ -2.51 (-9.99%)
TRG 52.45 Decreased By ▼ -5.59 (-9.63%)
UNITY 33.16 Decreased By ▼ -0.51 (-1.51%)
WTL 1.48 Decreased By ▼ -0.23 (-13.45%)
BR100 11,349 Decreased By -541.2 (-4.55%)
BR30 34,972 Decreased By -2384.1 (-6.38%)
KSE100 106,275 Decreased By -4795.3 (-4.32%)
KSE30 33,353 Decreased By -1555.7 (-4.46%)

ISLAMABAD: Minister for Energy Hammad Azhar said on Wednesday that negotiations on delay in dry-docking of Engro’s LNG terminal are under way and at the same time arrangements are being made to ensure electricity supply during its closure period.

“LNG’s terminal has to be dry-docked twice in 15 years and new vessel will substitute the existing vessel which requires five to six days. First two days LNG is not available but from third day gas starts ramping up,” he stated while talking to media after the Standing Committee on Power.

The Minister further clarified that Engro was scheduled to dry-dock last year but it could not as technicians were unable to come from Qatar due to Covid. Now the deadline for dry docking was June 30, he added.

“We are talking with Engro to find out if the date for dry-docking can be extended and at the same time, Power Division is working on a plan to meet the shortfall from other plants,” he added. The Minister said presently two issues are clubbed: (i) dry-docking at the peak season with Excelerate, a US firm giving the deadline of June 30, 2021 for dry-docking; and (ii) full output is received from Tarbela and Mangla reservoirs due to lower inflows owing to lower temperature in hilly areas. Azhar said shortfall of electricity will be minimized by operating other power plants during the period of dry-docking.

“We will try our best to manage the shortfall with other power plants. Furnace oil shipments for the IPPs are also being scheduled,” he added.

Copyright Business Recorder, 2021

Comments

Comments are closed.