AGL 31.20 Decreased By ▼ -1.95 (-5.88%)
AIRLINK 142.70 Decreased By ▼ -0.78 (-0.54%)
BOP 5.08 Decreased By ▼ -0.02 (-0.39%)
CNERGY 4.04 Increased By ▲ 0.08 (2.02%)
DCL 9.70 Increased By ▲ 0.88 (9.98%)
DFML 50.20 Decreased By ▼ -0.91 (-1.78%)
DGKC 79.50 Increased By ▲ 0.44 (0.56%)
FCCL 23.05 Decreased By ▼ -0.25 (-1.07%)
FFBL 46.10 Decreased By ▼ -0.15 (-0.32%)
FFL 9.05 Increased By ▲ 0.21 (2.38%)
HUBC 153.50 Decreased By ▼ -1.05 (-0.68%)
HUMNL 11.47 Increased By ▲ 0.05 (0.44%)
KEL 4.14 Decreased By ▼ -0.06 (-1.43%)
KOSM 10.27 Decreased By ▼ -1.06 (-9.36%)
MLCF 33.60 Decreased By ▼ -0.35 (-1.03%)
NBP 56.85 Decreased By ▼ -0.26 (-0.46%)
OGDC 137.25 Decreased By ▼ -0.15 (-0.11%)
PAEL 24.45 Increased By ▲ 0.30 (1.24%)
PIBTL 5.97 Decreased By ▼ -0.16 (-2.61%)
PPL 113.00 Increased By ▲ 0.20 (0.18%)
PRL 24.35 Decreased By ▼ -0.03 (-0.12%)
PTC 11.95 Decreased By ▼ -0.01 (-0.08%)
SEARL 57.76 Decreased By ▼ -0.35 (-0.6%)
TELE 7.60 Decreased By ▼ -0.04 (-0.52%)
TOMCL 41.88 Decreased By ▼ -0.95 (-2.22%)
TPLP 8.65 Increased By ▲ 0.10 (1.17%)
TREET 15.10 Decreased By ▼ -0.03 (-0.2%)
TRG 52.45 Increased By ▲ 0.99 (1.92%)
UNITY 27.86 Decreased By ▼ -0.04 (-0.14%)
WTL 1.34 Decreased By ▼ -0.04 (-2.9%)
BR100 8,350 Increased By 4.7 (0.06%)
BR30 26,917 Decreased By -120 (-0.44%)
KSE100 78,863 Increased By 15.3 (0.02%)
KSE30 25,026 Increased By 13.7 (0.05%)
Business & Finance

Pakistan says finalising details of PSGP project with Russia

  • Energy minister says govt 'moving fast', new terminals to have no take or pay liability
Published October 9, 2021

Minister for Energy Hammad Azhar said on Saturday that the government is "moving fast" on finalising details of the Pakistan-Stream Gas Pipeline (PSGP) project, formerly called the North-South pipeline, with Russian counterparts.

The minister shared the development in a tweet post, saying that the government has facilitated the allocation of pipeline capacity firm offer to two upcoming terminals. “The new terminals will have no take or pay liability on the government like previous terminals and will be based on B2B models,” informed Azhar.

The minister added that these measures will enhance the capability of the system to handle imported gas but in a “cost-efficient manner.”

Pakistan, Russia sign Heads of Terms for $2.5bn PSGP project

Back in July, after days of negotiations, Pakistan and Russia signed Heads of Terms to construct the $2.5 billion Pakistan-Stream Gas Pipeline (PSGP) project of 1,040 kilometers from Port Qasim to Kasur, to be completed by 2023.

The infrastructure of the 42-to-56 diameter pipeline, costing $2.25 -2.5 billion, will ensure the enhanced energy security of Pakistan.

The project will secure sustainable gas supply infrastructure for the next 40 years. This will be the most essential conduit between the installation of new LNG terminals and the industrial growth of Pakistan. Oil and Gas Regulatory Authority (Ogra) will determine the tariff of gas pipelines. The raw material of the pipeline will come from Russia whereas local companies will lay the pipeline.

The Pakistan Stream Gas Pipeline Project was announced in a joint statement of the Pakistan-Russia Inter-Governmental Commission on November 26-28, 2014.

The federal cabinet approved the Protocol to IGA on March 9, 2021. Amended IGA was signed on May 28, 2021, whereas the original IGA was signed on October 16, 2015. According to the IGA, Pakistan-nominated entity, Inter-State Gas System, will undertake the project through GIDC proceeds of (74%) and external equity (26%).

Comments

Comments are closed.