AGL 38.48 Decreased By ▼ -0.08 (-0.21%)
AIRLINK 203.02 Decreased By ▼ -4.75 (-2.29%)
BOP 10.17 Increased By ▲ 0.11 (1.09%)
CNERGY 6.54 Decreased By ▼ -0.54 (-7.63%)
DCL 9.58 Decreased By ▼ -0.41 (-4.1%)
DFML 40.02 Decreased By ▼ -1.12 (-2.72%)
DGKC 98.08 Decreased By ▼ -5.38 (-5.2%)
FCCL 34.96 Decreased By ▼ -1.39 (-3.82%)
FFBL 86.43 Decreased By ▼ -5.16 (-5.63%)
FFL 13.90 Decreased By ▼ -0.70 (-4.79%)
HUBC 131.57 Decreased By ▼ -7.86 (-5.64%)
HUMNL 14.02 Decreased By ▼ -0.08 (-0.57%)
KEL 5.61 Decreased By ▼ -0.36 (-6.03%)
KOSM 7.27 Decreased By ▼ -0.59 (-7.51%)
MLCF 45.59 Decreased By ▼ -1.69 (-3.57%)
NBP 66.38 Decreased By ▼ -7.38 (-10.01%)
OGDC 220.76 Decreased By ▼ -1.90 (-0.85%)
PAEL 38.48 Increased By ▲ 0.37 (0.97%)
PIBTL 8.91 Decreased By ▼ -0.36 (-3.88%)
PPL 197.88 Decreased By ▼ -7.97 (-3.87%)
PRL 39.03 Decreased By ▼ -0.82 (-2.06%)
PTC 25.47 Decreased By ▼ -1.15 (-4.32%)
SEARL 103.05 Decreased By ▼ -7.19 (-6.52%)
TELE 9.02 Decreased By ▼ -0.21 (-2.28%)
TOMCL 36.41 Decreased By ▼ -1.80 (-4.71%)
TPLP 13.75 Decreased By ▼ -0.02 (-0.15%)
TREET 25.12 Decreased By ▼ -1.33 (-5.03%)
TRG 58.04 Decreased By ▼ -2.50 (-4.13%)
UNITY 33.67 Decreased By ▼ -0.47 (-1.38%)
WTL 1.71 Decreased By ▼ -0.17 (-9.04%)
BR100 11,890 Decreased By -408.8 (-3.32%)
BR30 37,357 Decreased By -1520.9 (-3.91%)
KSE100 111,070 Decreased By -3790.4 (-3.3%)
KSE30 34,909 Decreased By -1287 (-3.56%)

BERLIN: With a big wheel, music and an appearance by CEO Elon Musk, Tesla pulled out all the stops Saturday to win over opponents of the electric carmaker's controversial new "gigafactory" near Berlin. Thousands of people were brought in by special shuttle buses, with long queues forming at the Gruenheide site of the US electric vehicle maker's first European factory.

"I wanted to take a look. Tesla's a great, very innovative car manufacturer," said 25-year-old local resident Dominic, an engineer.

Construction at the plant had begun under an exceptional procedure granted by authorities two years ago, but opposition from locals over environmental concerns has held up final approval.

Demonstrators were already on the scene on Saturday morning, with a few people bearing signs like "Stop Tesla" and "water and forest aren't for private profit" gathered around 100 metres (yards) from the site.

"It's unbelievable that you can build a factory like this without permission," said 69-year-old local activist Gurdrun Luebeck.

Musk appeared at the "Giga-Fest" in the afternoon, and had to battle problems with the teleprompter to deliver a few sentences in German beore continuing in English, stressing the company's green credentials.

"What this factory is about is to bring high volumes of affordable electric cars... to accelerate the transition to sustainable energy," he said to applause.

"We are ready to start production in a few months, basically November or December, and hopefully deliver our first cars in December," he added.

Despite the local resistance, construction has been completed in double-quick time, replacing a swathe of pine forest with an enormous concrete-paved expanse accessed via "Tesla Road".

The company has laid on a big wheel, electronic music and vegetarian food trucks - an event conceived in the image of Berlin, Europe's party capital.

Tesla began construction at the site in Gruenheide in 2019 after receiving preliminary approval under a special procedure.

But local authorities are still in the process of evaluating the environmental impact of the factory, despite the construction being all but finished.

The special treatment afforded to the company has angered some residents, who are concerned about the impact the plant could have on the water supply and biodiversity.

Supported by NGOs, opponents have sent letters, held protests and gone to court to try and stop the project.

Last year, work at the Tesla site was temporarily stopped after NGOs requested an injunction to protect the nearby natural habitat of endangered species of lizards and snakes while they were in their winter slumber.

A residents' consultation, part of the approval process, is due to close on October 14. Until the survey is completed, final approval cannot be given and production at the factory will not be allowed to begin.

Comments

Comments are closed.