AGL 37.72 Decreased By ▼ -0.22 (-0.58%)
AIRLINK 168.65 Increased By ▲ 13.43 (8.65%)
BOP 9.09 Increased By ▲ 0.02 (0.22%)
CNERGY 6.85 Increased By ▲ 0.13 (1.93%)
DCL 10.05 Increased By ▲ 0.52 (5.46%)
DFML 40.64 Increased By ▲ 0.33 (0.82%)
DGKC 93.24 Increased By ▲ 0.29 (0.31%)
FCCL 37.92 Decreased By ▼ -0.46 (-1.2%)
FFBL 78.72 Increased By ▲ 0.14 (0.18%)
FFL 13.46 Decreased By ▼ -0.14 (-1.03%)
HUBC 114.10 Increased By ▲ 3.91 (3.55%)
HUMNL 14.95 Increased By ▲ 0.06 (0.4%)
KEL 5.75 Increased By ▲ 0.02 (0.35%)
KOSM 8.23 Decreased By ▼ -0.24 (-2.83%)
MLCF 45.49 Decreased By ▼ -0.17 (-0.37%)
NBP 74.92 Decreased By ▼ -1.25 (-1.64%)
OGDC 192.93 Increased By ▲ 1.06 (0.55%)
PAEL 32.24 Increased By ▲ 1.76 (5.77%)
PIBTL 8.57 Increased By ▲ 0.41 (5.02%)
PPL 167.38 Increased By ▲ 0.82 (0.49%)
PRL 31.01 Increased By ▲ 1.57 (5.33%)
PTC 22.08 Increased By ▲ 2.01 (10.01%)
SEARL 100.83 Increased By ▲ 4.21 (4.36%)
TELE 8.45 Increased By ▲ 0.18 (2.18%)
TOMCL 34.84 Increased By ▲ 0.58 (1.69%)
TPLP 11.24 Increased By ▲ 1.02 (9.98%)
TREET 18.63 Increased By ▲ 0.97 (5.49%)
TRG 60.74 Decreased By ▼ -0.51 (-0.83%)
UNITY 31.98 Increased By ▲ 0.01 (0.03%)
WTL 1.61 Increased By ▲ 0.14 (9.52%)
BR100 11,289 Increased By 73.1 (0.65%)
BR30 34,140 Increased By 489.6 (1.45%)
KSE100 105,104 Increased By 545.3 (0.52%)
KSE30 32,554 Increased By 188.3 (0.58%)

ISLAMABAD: A 300 megawatts coal-fired Gwadar Power Plant would start functioning from October 2023, said official sources. The power plant would cater the needs of some 150,000 people of Gwadar by the end of 2023 under the 2050 Master Plan of Gwadar.

The power plant of independent power producer, is one of the key energy projects on the China Pakistan Economic Corridor (CPEC). The project aimed at improving reliability on local power supply would help gradually solving the problems in current economic development and urban construction in Gwadar region being restricted by the shortage of power.

"We are currently spending millions of dollars per annum to generate electricity from diesel generators. I hope the plant would be operationalise soon to solve the port's power scarcity issues. The power plant is of great significance to deepening the energy cooperation between China and Pakistan, boosting the development of the Belt and Road Initiative, improving the overall power structure of Balochistan, and promoting local economic development in Gwadar Port.

All major projects under CPEC in Gwadar, including Gwadar Power Plant, the New Gwadar International Airport Project, the China Pak Friendship Hospital, China-Pak Technical and Vocational Institute in Gwadar, the Gwadar East-bay Expressway Project, Gwadar Free Zone, and Gwadar Port would become a shining pearl in the region.

Comments

Comments are closed.