AIRLINK 217.98 No Change ▼ 0.00 (0%)
BOP 10.93 No Change ▼ 0.00 (0%)
CNERGY 7.55 No Change ▼ 0.00 (0%)
FCCL 34.83 No Change ▼ 0.00 (0%)
FFL 19.32 No Change ▼ 0.00 (0%)
FLYNG 25.15 No Change ▼ 0.00 (0%)
HUBC 131.09 No Change ▼ 0.00 (0%)
HUMNL 14.56 No Change ▼ 0.00 (0%)
KEL 5.18 No Change ▼ 0.00 (0%)
KOSM 7.36 No Change ▼ 0.00 (0%)
MLCF 45.63 No Change ▼ 0.00 (0%)
OGDC 222.08 No Change ▼ 0.00 (0%)
PACE 8.16 No Change ▼ 0.00 (0%)
PAEL 44.19 No Change ▼ 0.00 (0%)
PIAHCLA 17.69 No Change ▼ 0.00 (0%)
PIBTL 8.97 No Change ▼ 0.00 (0%)
POWERPS 12.51 No Change ▼ 0.00 (0%)
PPL 193.01 No Change ▼ 0.00 (0%)
PRL 43.17 No Change ▼ 0.00 (0%)
PTC 26.63 No Change ▼ 0.00 (0%)
SEARL 107.08 No Change ▼ 0.00 (0%)
SILK 1.04 No Change ▼ 0.00 (0%)
SSGC 45.00 No Change ▼ 0.00 (0%)
SYM 21.19 No Change ▼ 0.00 (0%)
TELE 10.15 No Change ▼ 0.00 (0%)
TPLP 14.51 No Change ▼ 0.00 (0%)
TRG 67.28 No Change ▼ 0.00 (0%)
WAVESAPP 11.29 No Change ▼ 0.00 (0%)
WTL 1.70 No Change ▼ 0.00 (0%)
YOUW 4.25 No Change ▼ 0.00 (0%)
BR100 12,198 Decreased By -198.4 (-1.6%)
BR30 36,459 Decreased By -888.2 (-2.38%)
KSE100 116,672 Decreased By -914.5 (-0.78%)
KSE30 36,736 Decreased By -329.5 (-0.89%)

JAKARTA: PT Vale Indonesia said on Wednesday its nickel matte production is expected to fall as much as 13% next year compared to normal levels, as furnace rebuilding delays brought about by the COVID-19 pandemic continue to impact output.

The Indonesian arm of the Brazilian mining giant is expecting nickel matte production of 65,000 tonnes in 2022, compared with an annual average of 70,000-75,000 tonnes.

“The plan was to rebuild it in the beginning of this year but due to COVID considerations, experts and materials from abroad could not arrive so it was postponed to December,” Vale Indonesia Chief Executive Febriany Eddy told a parliament hearing.

Next year’s projection, however, is slightly higher than 2021’s nickel matte output target of 64,000 tonnes.

The company would have to shut down its 20 year-old furnace on Dec. 14 for five months to rebuild it, she said, adding that the company has three other furnaces that will continue to operate as usual.

Vale Indonesia nickel matte production fell 13% in the first nine months of this year compared to the same period a year ago, also due to maintenance issues.

Comments

Comments are closed.