AGL 40.21 Increased By ▲ 0.18 (0.45%)
AIRLINK 127.64 Decreased By ▼ -0.06 (-0.05%)
BOP 6.67 Increased By ▲ 0.06 (0.91%)
CNERGY 4.45 Decreased By ▼ -0.15 (-3.26%)
DCL 8.73 Decreased By ▼ -0.06 (-0.68%)
DFML 41.16 Decreased By ▼ -0.42 (-1.01%)
DGKC 86.11 Increased By ▲ 0.32 (0.37%)
FCCL 32.56 Increased By ▲ 0.07 (0.22%)
FFBL 64.38 Increased By ▲ 0.35 (0.55%)
FFL 11.61 Increased By ▲ 1.06 (10.05%)
HUBC 112.46 Increased By ▲ 1.69 (1.53%)
HUMNL 14.81 Decreased By ▼ -0.26 (-1.73%)
KEL 5.04 Increased By ▲ 0.16 (3.28%)
KOSM 7.36 Decreased By ▼ -0.09 (-1.21%)
MLCF 40.33 Decreased By ▼ -0.19 (-0.47%)
NBP 61.08 Increased By ▲ 0.03 (0.05%)
OGDC 194.18 Decreased By ▼ -0.69 (-0.35%)
PAEL 26.91 Decreased By ▼ -0.60 (-2.18%)
PIBTL 7.28 Decreased By ▼ -0.53 (-6.79%)
PPL 152.68 Increased By ▲ 0.15 (0.1%)
PRL 26.22 Decreased By ▼ -0.36 (-1.35%)
PTC 16.14 Decreased By ▼ -0.12 (-0.74%)
SEARL 85.70 Increased By ▲ 1.56 (1.85%)
TELE 7.67 Decreased By ▼ -0.29 (-3.64%)
TOMCL 36.47 Decreased By ▼ -0.13 (-0.36%)
TPLP 8.79 Increased By ▲ 0.13 (1.5%)
TREET 16.84 Decreased By ▼ -0.82 (-4.64%)
TRG 62.74 Increased By ▲ 4.12 (7.03%)
UNITY 28.20 Increased By ▲ 1.34 (4.99%)
WTL 1.34 Decreased By ▼ -0.04 (-2.9%)
BR100 10,086 Increased By 85.5 (0.85%)
BR30 31,170 Increased By 168.1 (0.54%)
KSE100 94,764 Increased By 571.8 (0.61%)
KSE30 29,410 Increased By 209 (0.72%)

KARACHI: In adherence to Ministry of Energy (Petroleum Division), Government of Pakistan’s priority order for gas load management, where domestic sector tops the list and to serve the domestic customers with even more care and consideration, especially those in Balochistan already experiencing the winter season, gas supplies to all captive power plants of general industries (non-export) across Sindh and Balochistan had to be discontinued.

The discontinuation of gas supplies to all these Captive Power Plants (CPPs) was exercised under the Gas Sales Agreement (GSA) signed with CPPs, as the very agreement clearly states that; “Gas supply will be provided by the Company on ‘as and when available’ basis only during the period March to November each year.

The Consumer will make dual firing arrangements to avoid loss of production as and when Gas is not available during March to November and also during December to February when the Company will keep the Consumer’s Gas supply disconnected at his cost, each year.”

Gas supply to all these CPPs shall remain discontinued till further orders; however zero rated export industry including its CPPs along with the fertilizer sector will continue to get the gas.

The volume of gas curtailed from this arrangement would be diverted to domestic customers for them to cater their enhanced gas loads in context of the winter season.

It may be noted that in Balochistan, supply of additional gas is a must for the survival of human lives since gas serves as a LIFELINE to scores of populace needing to keep themselves warm through water and space heating gas appliances in the extremely low temperatures.

SSGC looks forward to CPPs of General Industries (Non export) for their understanding on the matter and expects their cooperation for serving the domestic customers through uninterrupted gas supplies.

Copyright Business Recorder, 2021

Comments

Comments are closed.