AGL 40.00 Decreased By ▼ -0.16 (-0.4%)
AIRLINK 129.53 Decreased By ▼ -2.20 (-1.67%)
BOP 6.68 Decreased By ▼ -0.01 (-0.15%)
CNERGY 4.63 Increased By ▲ 0.16 (3.58%)
DCL 8.94 Increased By ▲ 0.12 (1.36%)
DFML 41.69 Increased By ▲ 1.08 (2.66%)
DGKC 83.77 Decreased By ▼ -0.31 (-0.37%)
FCCL 32.77 Increased By ▲ 0.43 (1.33%)
FFBL 75.47 Increased By ▲ 6.86 (10%)
FFL 11.47 Increased By ▲ 0.12 (1.06%)
HUBC 110.55 Decreased By ▼ -1.21 (-1.08%)
HUMNL 14.56 Increased By ▲ 0.25 (1.75%)
KEL 5.39 Increased By ▲ 0.17 (3.26%)
KOSM 8.40 Decreased By ▼ -0.58 (-6.46%)
MLCF 39.79 Increased By ▲ 0.36 (0.91%)
NBP 60.29 No Change ▼ 0.00 (0%)
OGDC 199.66 Increased By ▲ 4.72 (2.42%)
PAEL 26.65 Decreased By ▼ -0.04 (-0.15%)
PIBTL 7.66 Increased By ▲ 0.18 (2.41%)
PPL 157.92 Increased By ▲ 2.15 (1.38%)
PRL 26.73 Increased By ▲ 0.05 (0.19%)
PTC 18.46 Increased By ▲ 0.16 (0.87%)
SEARL 82.44 Decreased By ▼ -0.58 (-0.7%)
TELE 8.31 Increased By ▲ 0.08 (0.97%)
TOMCL 34.51 Decreased By ▼ -0.04 (-0.12%)
TPLP 9.06 Increased By ▲ 0.25 (2.84%)
TREET 17.47 Increased By ▲ 0.77 (4.61%)
TRG 61.32 Decreased By ▼ -1.13 (-1.81%)
UNITY 27.43 Decreased By ▼ -0.01 (-0.04%)
WTL 1.38 Increased By ▲ 0.10 (7.81%)
BR100 10,407 Increased By 220 (2.16%)
BR30 31,713 Increased By 377.1 (1.2%)
KSE100 97,328 Increased By 1781.9 (1.86%)
KSE30 30,192 Increased By 614.4 (2.08%)

KARACHI: Claiming that it was the Pakistan Muslim League-Nawaz (PML-N) government that had eliminated load-shedding from the country, senior PML-N leader and former prime minister Shahid Khaqan Abbasi said on Monday the Pakistan Tehreek-e-Insaf (PTI) government was yet to build a power plant in the country despite being in power for the last three and a half years.

Addressing a press conference in Karachi, the PML-N stalwart said three power plants were built under the last PML-N government: one at Hub, another at Port Qasim and the third one at Sahiwal.

“And work on the fourth one was in progress when the party’s government’s term was over, elections were held and the PTI came into power, which is still to finish work on the project,” he said, adding it was because of these plants that the country had electricity in surplus.

Former prime minister went on to say that there were some other power projects as well, which the PML-N government had either completed or had launched.

“These included Nheelum Jhelum of 1,000 megawatts Tarbela 4, 1,500 megawatts, two nuclear power plants in Jhelum, 600 megawatts of coal-powered plant at Thar and others, including Nandipur Power Plant,” he elaborated.

Abbasi was of the view that LNG plants produced cheaper electricity not only inside the country, but also outside the country. He said the very idea of importing furnace oil smacked of ‘corruption’.

Comments

Comments are closed.