AGL 37.98 Decreased By ▼ -0.04 (-0.11%)
AIRLINK 212.50 Increased By ▲ 15.14 (7.67%)
BOP 9.65 Increased By ▲ 0.11 (1.15%)
CNERGY 6.38 Increased By ▲ 0.47 (7.95%)
DCL 9.20 Increased By ▲ 0.38 (4.31%)
DFML 37.60 Increased By ▲ 1.86 (5.2%)
DGKC 98.50 Increased By ▲ 1.64 (1.69%)
FCCL 35.94 Increased By ▲ 0.69 (1.96%)
FFBL 88.94 Increased By ▲ 6.64 (8.07%)
FFL 14.21 Increased By ▲ 1.04 (7.9%)
HUBC 130.90 Increased By ▲ 3.35 (2.63%)
HUMNL 13.70 Increased By ▲ 0.20 (1.48%)
KEL 5.53 Increased By ▲ 0.21 (3.95%)
KOSM 7.26 Increased By ▲ 0.26 (3.71%)
MLCF 45.40 Increased By ▲ 0.70 (1.57%)
NBP 60.85 Decreased By ▼ -0.57 (-0.93%)
OGDC 222.25 Increased By ▲ 7.58 (3.53%)
PAEL 40.81 Increased By ▲ 2.02 (5.21%)
PIBTL 8.49 Increased By ▲ 0.24 (2.91%)
PPL 199.47 Increased By ▲ 6.39 (3.31%)
PRL 39.94 Increased By ▲ 1.28 (3.31%)
PTC 27.70 Increased By ▲ 1.90 (7.36%)
SEARL 108.40 Increased By ▲ 4.80 (4.63%)
TELE 8.64 Increased By ▲ 0.34 (4.1%)
TOMCL 36.20 Increased By ▲ 1.20 (3.43%)
TPLP 13.60 Increased By ▲ 0.30 (2.26%)
TREET 24.38 Increased By ▲ 2.22 (10.02%)
TRG 61.15 Increased By ▲ 5.56 (10%)
UNITY 34.15 Increased By ▲ 1.18 (3.58%)
WTL 1.69 Increased By ▲ 0.09 (5.63%)
BR100 12,069 Increased By 342.1 (2.92%)
BR30 37,514 Increased By 1137.6 (3.13%)
KSE100 112,816 Increased By 3302.5 (3.02%)
KSE30 35,621 Increased By 1107.7 (3.21%)

PARIS: Mild weather forecast for the first half of January should prevent France’s electricity grid coming under strain but the outlook thereafter is uncertain due to a decline in its nuclear power capacity, French power grid operator RTE said on Thursday.

An RTE official told a news conference that since mid-December, 17 out of France’s 56 nuclear plants had halted production due to planned maintenance or technical problems, forcing the country to rely on imports to meet demand.

RTE said that France, which has traditionally been a power exporter, has frequently imported electricity since November and on Dec. 20, 21 and 22 it had to bring in 12 to 13 gigawatts (GW), close to its maximum technical capacity for imports.

It said in a statement that its nuclear power capacity would be 43 and 51 GW for most of January.

State-owned nuclear plant operator EDF said earlier this month that it had halted four additional reactors at Civeaux and Chooz after detecting cracks on the pipes of a reactor. The RTE official said the number of nuclear plants offline should drop to 12 by early January and to eight by the middle of the month.

But the grid operator said the outlook for French power supplies in the second half of January and February was uncertain, once the unseasonably mild weather comes to an end. RTE said hydropower supplies were good and near historical average levels, but the capacity of France’s few remaining coal plants to be deployed during a potential cold spell in February could be limited due to new regulations.

The new rules cap the time any coal plant can operate to about 700 hours a year, which is roughly equivalent to a month. But due to the fall in nuclear capacity, France’s coal plants are likely to operate full-time throughout January, RTE said. RTE said the worst-case scenario would be a prolonged cold spell combined with low wind power output in Europe and any further unplanned reductions in nuclear reactor availability.

Comments

Comments are closed.