AGL 38.02 Increased By ▲ 0.08 (0.21%)
AIRLINK 197.36 Increased By ▲ 3.45 (1.78%)
BOP 9.54 Increased By ▲ 0.22 (2.36%)
CNERGY 5.91 Increased By ▲ 0.07 (1.2%)
DCL 8.82 Increased By ▲ 0.14 (1.61%)
DFML 35.74 Decreased By ▼ -0.72 (-1.97%)
DGKC 96.86 Increased By ▲ 4.32 (4.67%)
FCCL 35.25 Increased By ▲ 1.28 (3.77%)
FFBL 88.94 Increased By ▲ 6.64 (8.07%)
FFL 13.17 Increased By ▲ 0.42 (3.29%)
HUBC 127.55 Increased By ▲ 6.94 (5.75%)
HUMNL 13.50 Decreased By ▼ -0.10 (-0.74%)
KEL 5.32 Increased By ▲ 0.10 (1.92%)
KOSM 7.00 Increased By ▲ 0.48 (7.36%)
MLCF 44.70 Increased By ▲ 2.59 (6.15%)
NBP 61.42 Increased By ▲ 1.61 (2.69%)
OGDC 214.67 Increased By ▲ 3.50 (1.66%)
PAEL 38.79 Increased By ▲ 1.21 (3.22%)
PIBTL 8.25 Increased By ▲ 0.18 (2.23%)
PPL 193.08 Increased By ▲ 2.76 (1.45%)
PRL 38.66 Increased By ▲ 0.49 (1.28%)
PTC 25.80 Increased By ▲ 2.35 (10.02%)
SEARL 103.60 Increased By ▲ 5.66 (5.78%)
TELE 8.30 Increased By ▲ 0.08 (0.97%)
TOMCL 35.00 Decreased By ▼ -0.03 (-0.09%)
TPLP 13.30 Decreased By ▼ -0.25 (-1.85%)
TREET 22.16 Decreased By ▼ -0.57 (-2.51%)
TRG 55.59 Increased By ▲ 2.72 (5.14%)
UNITY 32.97 Increased By ▲ 0.01 (0.03%)
WTL 1.60 Increased By ▲ 0.08 (5.26%)
BR100 11,727 Increased By 342.7 (3.01%)
BR30 36,377 Increased By 1165.1 (3.31%)
KSE100 109,513 Increased By 3238.2 (3.05%)
KSE30 34,513 Increased By 1160.1 (3.48%)

ISLAMABAD: The newly appointed Secretary Power, Syed Asif Hyder Shah has convened an internal meeting on Monday (today) on the negotiations backdrop, modalities and point of convergence and divergence on approval of Power Purchase Agency Agreement (PPAA), Interconnection Agreement (IC), and Tariff Differential Subsidy (TDS) agreement for power supply to Karachi Electric (KE) in addition to existing supply of 650MW, well informed sources told Business Recorder.

On December 15, in a meeting held in Prime Minister Office (PMO) Prime Minister Imran Khan directed Nepra to resolve issues surrounding KEL integration plan, contracts and connection agreements, etc.

Power Division, sources said has already finalized new PPAA and IC with Karachi Electric (KE) for supply of 1400MW electricity to the latter, but disagreement still exists on base load verses firm capacity and Late Payment Surcharge for regulatory delays between the two parties.

A Power Purchase Agreement (PPA) was signed with KESC (now K-Electric) by NTDC on January 26, 2010 for sale purchase of power up to 50MW. The agreement was effective for 5 years till 25 January 2015. Sindh High Court in suit No 205 restrained the Government and NTDC from interfering in the functioning of power purchase agreement and passed an order to NTDC to continue to supply electricity to KESC on Feb 6, 2014.

Supply of 1,400MW: Govt finalises new PPAA, ICA with KE

The Cabinet Committee on Energy (CCoE), in its decisions of June 19, 2020 and August 27, 2020 approved supply of additional power to K-Electric from National Grid in addition to existing supply of 650 MW.

Pursuant to the directions of the CCoE, multiple meetings were held between the Finance Division, Power Division, CPPA-G, NTDCL and K-Electric to finalize PPAA, ICA and TDS agreements for supply of power from national grid to K-Electric including existing supply of 650MW. The final draft PPAA, ICA and TDS agreements, duly initiated by the parties have also been attached with the summary of Power Division.

According to sources, K-Electric has agreed to provide a Standby Letter of Credit (SBLC) backed by Master Collection Accounts as security against payment to CPPA-G under the PPA, draft of which would also be shared with the CCoE.

Despite substantial consensus on the drafts of the three agreements a few areas have not been agreed with KE. These include the issue of base load verses firm capacity in ICA and late payment surcharge on account of regulatory delays in TDS agreement.

On the issue of base load verses firm capacity, NTDC argued that K-Electric is to be treated at par with the rest of the country on pro-rata basis in line with Grid Code 2005, and if there is any shortfall of available power in NTDC system, due to any reasons whether force-majeure or otherwise, K-Electric shall have to share the same on pro-rata basis with other Distribution Companies.

However, KE desires that the power provided to it be made available on base-load unwavering basis and power curtailment only be done during force majeure.

Another issue which is still unresolved between the Power Division and Karachi Electric is Late Payment Surcharge (LPS) for regulatory delays.

KE argues that tariff determinations, monthly or quarterly tariff adjustments are to be made in a timely manner as per the statutory timelines (as defined in NEPRA Act and rules and regulations) and in case of any delays beyond these statutory timelines, a mechanism for compensation of cost of such delays in respective tariff of K-Electric be allowed by the regulator.

Power Division, which has to pay the amount of tariff differential subsidy through its entity CPPA-G, the market operator, has not supported the proposal.

Power Division has requested the CCOE to approve the appended draft PPA, ICA and TDS agreement covering the existing supply (650 MW) and additional supply of 1400MW after going through the versions of Power Division/ NTDC.

Copyright Business Recorder, 2022

Comments

Comments are closed.