AIRLINK 191.84 Decreased By ▼ -1.66 (-0.86%)
BOP 9.87 Increased By ▲ 0.23 (2.39%)
CNERGY 7.67 Increased By ▲ 0.14 (1.86%)
FCCL 37.86 Increased By ▲ 0.16 (0.42%)
FFL 15.76 Increased By ▲ 0.16 (1.03%)
FLYNG 25.31 Decreased By ▼ -0.28 (-1.09%)
HUBC 130.17 Increased By ▲ 3.10 (2.44%)
HUMNL 13.59 Increased By ▲ 0.09 (0.67%)
KEL 4.67 Increased By ▲ 0.09 (1.97%)
KOSM 6.21 Increased By ▲ 0.11 (1.8%)
MLCF 44.29 Increased By ▲ 0.33 (0.75%)
OGDC 206.87 Increased By ▲ 3.63 (1.79%)
PACE 6.56 Increased By ▲ 0.16 (2.5%)
PAEL 40.55 Decreased By ▼ -0.43 (-1.05%)
PIAHCLA 17.59 Increased By ▲ 0.10 (0.57%)
PIBTL 8.07 Increased By ▲ 0.41 (5.35%)
POWER 9.24 Increased By ▲ 0.16 (1.76%)
PPL 178.56 Increased By ▲ 4.31 (2.47%)
PRL 39.08 Increased By ▲ 1.01 (2.65%)
PTC 24.14 Increased By ▲ 0.07 (0.29%)
SEARL 107.85 Increased By ▲ 0.61 (0.57%)
SILK 0.97 No Change ▼ 0.00 (0%)
SSGC 39.11 Increased By ▲ 2.71 (7.45%)
SYM 19.12 Increased By ▲ 0.08 (0.42%)
TELE 8.60 Increased By ▲ 0.36 (4.37%)
TPLP 12.37 Increased By ▲ 0.59 (5.01%)
TRG 66.01 Increased By ▲ 1.13 (1.74%)
WAVESAPP 12.78 Increased By ▲ 1.15 (9.89%)
WTL 1.70 Increased By ▲ 0.02 (1.19%)
YOUW 3.95 Increased By ▲ 0.10 (2.6%)
BR100 11,930 Increased By 162.4 (1.38%)
BR30 35,660 Increased By 695.9 (1.99%)
KSE100 113,206 Increased By 1719 (1.54%)
KSE30 35,565 Increased By 630.8 (1.81%)

ISLAMABAD: Pakistan Muslim League-Nawaz (PML-N) senior leader Senator Musaddiq Malik has blamed Imran Khan’s government for the current load shedding in the country. In a statement, Malik said that in 2013, there was load shedding everywhere in Pakistan from 12-14 hours in urban areas of Pakistan and 14-16 and 18 hours in rural areas.

However, Mian Nawaz Sharif worked tirelessly and his government added 12,000 MW of additional power to the national grid and his hard work ended load shedding in the country. Nawaz Sharif’s hard work increased Pakistan’s power generation capacity to 35,000 MW, he pointed out.

He said that it was unfortunate that in 2022, the same additional 12000 MW of power would be cut off which was produced with great effort during the PML-N era. He said today more than 5,000 MW of this electricity is unavailable because the Imran government did not buy oil and gas. An additional 4,000 MW is not available due to non-repair of power plants, he added. He went on to say that had Imran government arranged timely fuel and repairs, the people would not have suffered from load shedding.

“2000 MW load shedding was regular schedule for maintenance; this is the period during which power plants are repaired every year. During PML-N tenure 2013-2018, repairs and overhauling were done in winter and spring when people need less electricity. But Imran Khan’s failed government repaired power plants in the summer, he said adding this showed his intellect and managerial ability. The additional 12000 MW power generated during Nawaz Sharif era was not coming to the national grid due to incompetence, cheapness and criminal negligence of Imran government.

Copyright Business Recorder, 2022

Comments

Comments are closed.