AGL 38.31 Decreased By ▼ -0.25 (-0.65%)
AIRLINK 215.00 Increased By ▲ 7.23 (3.48%)
BOP 10.06 No Change ▼ 0.00 (0%)
CNERGY 6.77 Decreased By ▼ -0.31 (-4.38%)
DCL 9.85 Decreased By ▼ -0.14 (-1.4%)
DFML 40.89 Decreased By ▼ -0.25 (-0.61%)
DGKC 101.94 Decreased By ▼ -1.52 (-1.47%)
FCCL 36.35 No Change ▼ 0.00 (0%)
FFBL 91.22 Decreased By ▼ -0.37 (-0.4%)
FFL 14.10 Decreased By ▼ -0.50 (-3.42%)
HUBC 136.90 Decreased By ▼ -2.53 (-1.81%)
HUMNL 14.00 Decreased By ▼ -0.10 (-0.71%)
KEL 5.87 Decreased By ▼ -0.10 (-1.68%)
KOSM 7.38 Decreased By ▼ -0.48 (-6.11%)
MLCF 46.98 Decreased By ▼ -0.30 (-0.63%)
NBP 66.38 Decreased By ▼ -7.38 (-10.01%)
OGDC 221.45 Decreased By ▼ -1.21 (-0.54%)
PAEL 38.05 Decreased By ▼ -0.06 (-0.16%)
PIBTL 9.05 Decreased By ▼ -0.22 (-2.37%)
PPL 204.50 Decreased By ▼ -1.35 (-0.66%)
PRL 39.60 Decreased By ▼ -0.25 (-0.63%)
PTC 26.20 Decreased By ▼ -0.42 (-1.58%)
SEARL 107.25 Decreased By ▼ -2.99 (-2.71%)
TELE 9.04 Decreased By ▼ -0.19 (-2.06%)
TOMCL 37.90 Decreased By ▼ -0.31 (-0.81%)
TPLP 13.69 Decreased By ▼ -0.08 (-0.58%)
TREET 26.10 Decreased By ▼ -0.35 (-1.32%)
TRG 59.68 Decreased By ▼ -0.86 (-1.42%)
UNITY 33.50 Decreased By ▼ -0.64 (-1.87%)
WTL 1.77 Decreased By ▼ -0.11 (-5.85%)
BR100 12,165 Decreased By -133.6 (-1.09%)
BR30 38,276 Decreased By -601.6 (-1.55%)
KSE100 113,422 Decreased By -1438.9 (-1.25%)
KSE30 35,728 Decreased By -467.5 (-1.29%)

LAHORE Water Resources Federal Minister Syed Khursheed Ahmed Shah has said that Dasu is a vital project to stabilize Pakistan`s economy by providing low-cost hydel electricity and triggering a new era of socio-economic development in the country.

The Federal Minister stated this today while visiting Dasu Hydropower Project, being constructed on River Indus, upstream of Dasu town in Upper Kohistan district of Khyber Pakhtunkhwa province. He was accompanied by WAPDA Chairman Naveed Asghar Chaudhry. WAPDA project’s management and representatives of the consultants and the contractors were also present during the visit.

Speaking on the occasion, the Federal Minister said that electricity generation from Dasu Hydropower Project will commence in 2026 and tremendously contribute to cope with increasing requirement of the country by injecting sizeable cheap and green electricity to the national grid. He expressed satisfaction over pace of progress and directed WAPDA to complete the project within stipulated timeframe.

The Federal Minister also addressed the locals during the visit. He directed WAPDA that the locals be given priority in jobs on the project. A meeting will soon be convened at Islamabad with all the stakeholders to review self-managed resettlement package to address grievances of the locals, he added.

Outgoing Wapda chief visits 4 under-construction dams

Earlier, the Federal Minister had a detailed round of the various components of the project including diversion tunnels and powerhouse complex and reviewed construction activities going on there.

WAPDA GM and PD Anwar-ul-Haq apprised the Minister that the 4320 MW- Dasu Hydropower Project is being completed in two stages. At present, WAPDA is constructing stage-I with installed generation capacity of 2160 MW and annual energy generation of 12 billion low-cost and environment-friendly electricity. The stage-II, when implemented, will also provide 9 billion units to the national grid.

On completion of the both Stages, Dasu will be the project with highest annual energy generation in Pakistan i.e. 21 billion units per annum on the average. The Minister was further apprised that Rs. 17.34 billion are being spent on CBM schemes by WAPDA for economic and social development in the project area. About 3300 jobs, including 1808 for locals, have so far been created, which will increase to 8000 jobs during peak construction period of the project.

Copyright Business Recorder, 2022

Comments

Comments are closed.