AIRLINK 173.68 Decreased By ▼ -2.21 (-1.26%)
BOP 10.82 Decreased By ▼ -0.16 (-1.46%)
CNERGY 8.26 Increased By ▲ 0.26 (3.25%)
FCCL 46.41 Increased By ▲ 0.29 (0.63%)
FFL 16.14 Increased By ▲ 0.07 (0.44%)
FLYNG 27.80 Increased By ▲ 0.38 (1.39%)
HUBC 146.32 Increased By ▲ 2.36 (1.64%)
HUMNL 13.40 Increased By ▲ 0.05 (0.37%)
KEL 4.39 Decreased By ▼ -0.11 (-2.44%)
KOSM 5.93 Decreased By ▼ -0.05 (-0.84%)
MLCF 59.66 Increased By ▲ 0.16 (0.27%)
OGDC 232.73 Decreased By ▼ -0.02 (-0.01%)
PACE 5.80 Decreased By ▼ -0.08 (-1.36%)
PAEL 47.98 Increased By ▲ 0.50 (1.05%)
PIAHCLA 17.75 Decreased By ▼ -0.22 (-1.22%)
PIBTL 10.40 Decreased By ▼ -0.18 (-1.7%)
POWER 11.32 Decreased By ▼ -0.06 (-0.53%)
PPL 191.48 Decreased By ▼ -1.82 (-0.94%)
PRL 36.83 Decreased By ▼ -0.17 (-0.46%)
PTC 23.20 Decreased By ▼ -0.57 (-2.4%)
SEARL 98.76 Decreased By ▼ -1.11 (-1.11%)
SILK 1.15 No Change ▼ 0.00 (0%)
SSGC 36.62 Decreased By ▼ -0.57 (-1.53%)
SYM 14.70 Decreased By ▼ -0.25 (-1.67%)
TELE 7.73 Decreased By ▼ -0.02 (-0.26%)
TPLP 10.75 Decreased By ▼ -0.12 (-1.1%)
TRG 66.01 Increased By ▲ 0.87 (1.34%)
WAVESAPP 10.82 Decreased By ▼ -0.09 (-0.82%)
WTL 1.32 Decreased By ▼ -0.02 (-1.49%)
YOUW 3.79 Decreased By ▼ -0.02 (-0.52%)
BR100 12,644 Increased By 35.1 (0.28%)
BR30 39,387 Increased By 124.3 (0.32%)
KSE100 117,807 Increased By 117806.8 (INF%)
KSE30 36,347 Increased By 36346.7 (INF%)

KARACHI: Administrator Karachi Barrister Murtaza Wahab on Friday directed the Director General Engineering Department of Karachi Metropolitan Corporation (KMC) to complete the under-construction roads within the stipulated 45 days in any case.

Officials said that the Engineering Department is carrying out construction and lining of more than 20 roads in different areas of the city under special grant of Rs.1 billion from the Sindh government.

The roads of District Central where construction work has started immediately included Gharibabad to Usman Memorial Hospital, Madina Masjid Food Street, Ziauddin Hospital Chowrangi to Mujahid Colony, Sir Syed Girls College to Lasbela Chowrangi, Bada Maidan to Khilifat Chowk and M. Mateen Food Road. These roads are being constructed at a cost of Rs. 50 million each.

In East District University Road, Sindhi Muslim Society Chowrangi and Commercial Area, Link Road Tipu Sultan, Mubarak Shaheed Road is being constructed.

In South District, construction work is in progress on Shahrah e Attar and adjacent areas, Shahrah e Iran, Shahrah e Liaquat, MA Jinnah Road at a cost of Rs. 50 million each.

Similarly in Malir district, Khalid Bin Waleed Road is under construction from Bhens Colony to Mehran Highway. Hyedri Chowk Road, Ammar Yasir Phase One and internal streets, and the road from Qadeer Chowk to Nafees Cinema are also under construction.

In West and Keamari Districts, Jackson Market Road and adjacent areas roads and Site Flyover to Lyari Expressway are also being repaired or constructed. Similarly, flyovers and expansion joints of bridges are also being replaced.

Copyright Business Recorder, 2022

Comments

Comments are closed.