AIRLINK 204.45 Increased By ▲ 3.55 (1.77%)
BOP 10.09 Decreased By ▼ -0.06 (-0.59%)
CNERGY 6.91 Increased By ▲ 0.03 (0.44%)
FCCL 34.83 Increased By ▲ 0.74 (2.17%)
FFL 17.21 Increased By ▲ 0.23 (1.35%)
FLYNG 24.52 Increased By ▲ 0.48 (2%)
HUBC 137.40 Increased By ▲ 5.70 (4.33%)
HUMNL 13.82 Increased By ▲ 0.06 (0.44%)
KEL 4.91 Increased By ▲ 0.10 (2.08%)
KOSM 6.70 No Change ▼ 0.00 (0%)
MLCF 44.31 Increased By ▲ 0.98 (2.26%)
OGDC 221.91 Increased By ▲ 3.16 (1.44%)
PACE 7.09 Increased By ▲ 0.11 (1.58%)
PAEL 42.97 Increased By ▲ 1.43 (3.44%)
PIAHCLA 17.08 Increased By ▲ 0.01 (0.06%)
PIBTL 8.59 Decreased By ▼ -0.06 (-0.69%)
POWER 9.02 Decreased By ▼ -0.09 (-0.99%)
PPL 190.60 Increased By ▲ 3.48 (1.86%)
PRL 43.04 Increased By ▲ 0.98 (2.33%)
PTC 25.04 Increased By ▲ 0.05 (0.2%)
SEARL 106.41 Increased By ▲ 6.11 (6.09%)
SILK 1.02 Increased By ▲ 0.01 (0.99%)
SSGC 42.91 Increased By ▲ 0.58 (1.37%)
SYM 18.31 Increased By ▲ 0.33 (1.84%)
TELE 9.14 Increased By ▲ 0.03 (0.33%)
TPLP 13.11 Increased By ▲ 0.18 (1.39%)
TRG 68.13 Decreased By ▼ -0.22 (-0.32%)
WAVESAPP 10.24 Decreased By ▼ -0.05 (-0.49%)
WTL 1.87 Increased By ▲ 0.01 (0.54%)
YOUW 4.09 Decreased By ▼ -0.04 (-0.97%)
BR100 12,137 Increased By 188.4 (1.58%)
BR30 37,146 Increased By 778.3 (2.14%)
KSE100 115,272 Increased By 1435.3 (1.26%)
KSE30 36,311 Increased By 549.3 (1.54%)

LAHORE: The Punjab Provincial Development Working Party approved thirteen development schemes of various sectors with an estimated cost of Rs. 36,517.44 million.

These schemes were approved in the 23rd meeting of Provincial Development Working Party (PDWP) of current fiscal year 2022-23 presided over the Chairman Planning & Development Board Abdullah Khan Sumbal.

The approved development schemes included Strengthening of Muhammad Nawaz Sharif University of Agriculture, Multan at the cost of Rs. 650 million, Rehabilitation of Road from Chunian to Habib Abad Lahore Multan Road, Length=19.95 Km, District Kasur (Revised) at the cost of Rs. 449.621 million, Widening / Improvement of Jhang Sahiwal Sargodha Road in District Sargodha at the cost of Rs. 2,180.206 million, Rehabilitation / Reconstruction of Road from Faisalabad Road to Lahore Road along with Canal Bank Length 28.47 Km in District Sargodha at the cost of Rs. 1,179.868 million, Widening / Improvement / Reconstruction of Road from Millat Road Chak No. 115/JB to 62/JB via 114/JB, 113/JB, 111/JB, 112/JB, 1/JB 46/JB, 47/JB, 50/JB Baba Bakala, 56/JB, 60/JB Length-55 Km, District Faisalabad at the cost of Rs. 911.852 million, Construction of Dual Carriageway from Sheikh Fazal to Chichawatni, Length-24.15 Km, Sahiwal at the cost of Rs. 4,555.787 million, Improvement of Energy Efficiency in WASA Systems at the cost of Rs. 495.000 million, Feasibility Study for Solarization of Courts and District Session Courts of Punjab (PC-II) at the cost of Rs. 10.000 million, Improvement of Bus Stops, Sahiwal at the cost of Rs. 110.109 million, High Street Livable Model Road, Arra Tullah Road Livable Model Road, Pedestrian & Cycling Track, Sahiwal at the cost of Rs. 1,639.831 million, Grade Separator at Railway crossing at Shahabpur Road, Sialkot at the cost of Rs. 2,105.57 million, Signals and Junctions Improvement at Sialkot at the cost of Rs. 1,483.40 million and Construction of Parking Sheds for Solid Waste Machinery in Sahiwal and Sialkot City (2nd Revised) at the cost of Rs. 507.406 million.

Copyright Business Recorder, 2022

Comments

Comments are closed.