AGL 40.00 No Change ▼ 0.00 (0%)
AIRLINK 129.06 Decreased By ▼ -0.47 (-0.36%)
BOP 6.75 Increased By ▲ 0.07 (1.05%)
CNERGY 4.49 Decreased By ▼ -0.14 (-3.02%)
DCL 8.55 Decreased By ▼ -0.39 (-4.36%)
DFML 40.82 Decreased By ▼ -0.87 (-2.09%)
DGKC 80.96 Decreased By ▼ -2.81 (-3.35%)
FCCL 32.77 No Change ▼ 0.00 (0%)
FFBL 74.43 Decreased By ▼ -1.04 (-1.38%)
FFL 11.74 Increased By ▲ 0.27 (2.35%)
HUBC 109.58 Decreased By ▼ -0.97 (-0.88%)
HUMNL 13.75 Decreased By ▼ -0.81 (-5.56%)
KEL 5.31 Decreased By ▼ -0.08 (-1.48%)
KOSM 7.72 Decreased By ▼ -0.68 (-8.1%)
MLCF 38.60 Decreased By ▼ -1.19 (-2.99%)
NBP 63.51 Increased By ▲ 3.22 (5.34%)
OGDC 194.69 Decreased By ▼ -4.97 (-2.49%)
PAEL 25.71 Decreased By ▼ -0.94 (-3.53%)
PIBTL 7.39 Decreased By ▼ -0.27 (-3.52%)
PPL 155.45 Decreased By ▼ -2.47 (-1.56%)
PRL 25.79 Decreased By ▼ -0.94 (-3.52%)
PTC 17.50 Decreased By ▼ -0.96 (-5.2%)
SEARL 78.65 Decreased By ▼ -3.79 (-4.6%)
TELE 7.86 Decreased By ▼ -0.45 (-5.42%)
TOMCL 33.73 Decreased By ▼ -0.78 (-2.26%)
TPLP 8.40 Decreased By ▼ -0.66 (-7.28%)
TREET 16.27 Decreased By ▼ -1.20 (-6.87%)
TRG 58.22 Decreased By ▼ -3.10 (-5.06%)
UNITY 27.49 Increased By ▲ 0.06 (0.22%)
WTL 1.39 Increased By ▲ 0.01 (0.72%)
BR100 10,445 Increased By 38.5 (0.37%)
BR30 31,189 Decreased By -523.9 (-1.65%)
KSE100 97,798 Increased By 469.8 (0.48%)
KSE30 30,481 Increased By 288.3 (0.95%)

ISLAMABAD: Karachi Electric (KE) has again sought support from Managing Director, National Transmission and Despatch Company (NTDC) for restoration of Cross Tripping Protection Scheme.

KE has written has three letters regarding the visibility of Cross Trip Protection Scheme in Network Control Centre of KE that has been disabled by NTDC team since November 19, 2021.

In a letter to MD NTDC, KE has stated that it has been approaching NTDC repeatedly for the restoration of the visibility of this scheme in Network Control Centre of KE through different correspondences.

A proposal was submitted in this regard to formulate a technical committee of NTDC and KE engineers with nominations from KE side to amicably resolve the matter, but no response has been received from NTDC as yet.

KE maintains that on the day of power breakdown in NTDC system on October 13, 2022, NPCC while restoring their part of power system, carried out the switching off operations of the breakers at 500-kV NKI grid without intimating KE Network Control engineers. These operations at 12:22 Hours triggered the activation logic of CTS and some 550MW load that was restored in KE network through their own back start facilities which collapsed again due to severe frequent variations caused by load ejected through CTS logic.

Had the visibility of CTS been available at KE network Control Centre, KE LDC engineers would have contacted the NPCC immediately to stop the switching. This incident further fortifies KE’s stance for the importance of the visibility network control centre.

KE, in its letter to MD NTDC, has requested that the visibility of KE Network Control system be restored.

Copyright Business Recorder, 2022

Comments

Comments are closed.