AIRLINK 198.50 Decreased By ▼ -2.74 (-1.36%)
BOP 10.03 Increased By ▲ 0.06 (0.6%)
CNERGY 7.34 Increased By ▲ 0.45 (6.53%)
FCCL 36.46 Increased By ▲ 1.10 (3.11%)
FFL 16.96 Decreased By ▼ -0.19 (-1.11%)
FLYNG 25.17 Increased By ▲ 0.96 (3.97%)
HUBC 135.00 Decreased By ▼ -3.19 (-2.31%)
HUMNL 14.21 Increased By ▲ 0.14 (1%)
KEL 4.78 Decreased By ▼ -0.08 (-1.65%)
KOSM 6.94 Increased By ▲ 0.28 (4.2%)
MLCF 45.56 Decreased By ▼ -0.75 (-1.62%)
OGDC 219.75 Decreased By ▼ -2.79 (-1.25%)
PACE 6.98 Decreased By ▼ -0.08 (-1.13%)
PAEL 42.26 Decreased By ▼ -0.88 (-2.04%)
PIAHCLA 16.89 Decreased By ▼ -0.14 (-0.82%)
PIBTL 8.53 Decreased By ▼ -0.01 (-0.12%)
POWER 9.65 Increased By ▲ 0.55 (6.04%)
PPL 187.40 Decreased By ▼ -1.36 (-0.72%)
PRL 42.24 Decreased By ▼ -1.03 (-2.38%)
PTC 25.00 Decreased By ▼ -0.35 (-1.38%)
SEARL 105.80 Decreased By ▼ -4.62 (-4.18%)
SILK 1.00 Decreased By ▼ -0.03 (-2.91%)
SSGC 41.95 Decreased By ▼ -0.69 (-1.62%)
SYM 18.23 Decreased By ▼ -0.34 (-1.83%)
TELE 9.03 Decreased By ▼ -0.09 (-0.99%)
TPLP 13.00 Decreased By ▼ -0.68 (-4.97%)
TRG 66.50 Decreased By ▼ -1.66 (-2.44%)
WAVESAPP 11.30 Increased By ▲ 1.03 (10.03%)
WTL 1.80 Decreased By ▼ -0.07 (-3.74%)
YOUW 4.02 Increased By ▲ 0.01 (0.25%)
BR100 12,167 Decreased By -52.7 (-0.43%)
BR30 36,875 Decreased By -442.5 (-1.19%)
KSE100 115,390 Decreased By -455 (-0.39%)
KSE30 36,325 Decreased By -150.8 (-0.41%)

Pakistan Refinery Limited (PRL) will shut down its operations from December 10 for approximately 20 days, the company said in a notice sent to the Pakistan Stock Exchange (PSX) on Friday.

“This is to inform you that PRL is carrying out its regeneration shutdown starting from 10th December 2022 … Consequently, the refinery will be shut down during this period,” read the notice.

Earlier, Business Recorder reported that the Oil and Gas Regulatory Authority (OGRA) barred PRL from shutting down in December 2022 to meet diesel requirements in the winter months.

OGRA, in its letter, directed PRL to strictly adhere to the previous directives and abstain from shutdown till February, 2023 in the best national interest.

The OGRA also gave reference of PRL’s letter of October 13, 2022, and noted that the request of PRL for temporary shutdown has been examined by the OGRA’s Oil Supply Chain Department viz current demand-supply trend of POL products, adding that keeping in view the high demand of diesel in winter season and significant contribution of PRL therein, PRL was requested to reassess its technical and HSE issue and reschedule the proposed shutdown to 1st half of February 2023.

Incorporated in Pakistan as a public limited company in 1960, PRL is a hydro skimming refinery designed to process imported and local crude oil, located on the coastal belt of Karachi, Pakistan.

The refinery’s current capacity stands approximately at 50,000 barrels per day of crude oil into petroleum products, such as furnace oil, high-speed diesel, kerosene oil, jet fuel and motor gasoline, among others.

The refinery is operating at two locations; the main processing facility is located at Korangi Creek with a supporting crude berthing and storage facility at Keamari.

Comments

Comments are closed.

Dr. Malaria amadick Dec 09, 2022 05:29pm
What a joke...ignores direction of authority and shuts down
thumb_up Recommended (0)
Kawsar Allah Dec 10, 2022 09:25am
Hello Sir i belong to kpk north waziristan i work for total company ltd safety supervisor and loading supervisor but given me a chance
thumb_up Recommended (0)