AGL 40.00 Decreased By ▼ -0.16 (-0.4%)
AIRLINK 129.53 Decreased By ▼ -2.20 (-1.67%)
BOP 6.68 Decreased By ▼ -0.01 (-0.15%)
CNERGY 4.63 Increased By ▲ 0.16 (3.58%)
DCL 8.94 Increased By ▲ 0.12 (1.36%)
DFML 41.69 Increased By ▲ 1.08 (2.66%)
DGKC 83.77 Decreased By ▼ -0.31 (-0.37%)
FCCL 32.77 Increased By ▲ 0.43 (1.33%)
FFBL 75.47 Increased By ▲ 6.86 (10%)
FFL 11.47 Increased By ▲ 0.12 (1.06%)
HUBC 110.55 Decreased By ▼ -1.21 (-1.08%)
HUMNL 14.56 Increased By ▲ 0.25 (1.75%)
KEL 5.39 Increased By ▲ 0.17 (3.26%)
KOSM 8.40 Decreased By ▼ -0.58 (-6.46%)
MLCF 39.79 Increased By ▲ 0.36 (0.91%)
NBP 60.29 No Change ▼ 0.00 (0%)
OGDC 199.66 Increased By ▲ 4.72 (2.42%)
PAEL 26.65 Decreased By ▼ -0.04 (-0.15%)
PIBTL 7.66 Increased By ▲ 0.18 (2.41%)
PPL 157.92 Increased By ▲ 2.15 (1.38%)
PRL 26.73 Increased By ▲ 0.05 (0.19%)
PTC 18.46 Increased By ▲ 0.16 (0.87%)
SEARL 82.44 Decreased By ▼ -0.58 (-0.7%)
TELE 8.31 Increased By ▲ 0.08 (0.97%)
TOMCL 34.51 Decreased By ▼ -0.04 (-0.12%)
TPLP 9.06 Increased By ▲ 0.25 (2.84%)
TREET 17.47 Increased By ▲ 0.77 (4.61%)
TRG 61.32 Decreased By ▼ -1.13 (-1.81%)
UNITY 27.43 Decreased By ▼ -0.01 (-0.04%)
WTL 1.38 Increased By ▲ 0.10 (7.81%)
BR100 10,407 Increased By 220 (2.16%)
BR30 31,713 Increased By 377.1 (1.2%)
KSE100 97,328 Increased By 1781.9 (1.86%)
KSE30 30,192 Increased By 614.4 (2.08%)

NEW YORK: Freeport LNG’s long-shut export plant in Texas started receiving natural gas from pipelines over the long US Martin Luther King Jr holiday weekend, according to data from Refinitiv, a possible sign the plant is finally moving closer to exiting an outage.

Gas started flowing to Freeport on Jan 14 and was on track to reach 69 million cubic feet per day (mmcfd) on Tuesday, according to data from Refinitiv.

The last time gas flowed to Freeport was in late December when the plant was using the fuel to maintain a flare system, according to a source familiar with the plant. Officials at Freeport, which shut in a fire on June 8, 2022, said on Tuesday the plant was still on track to restart in the second half of January, pending regulatory approvals.

Freeport did not comment in an email on why gas started flowing to the plant over the weekend. Gas futures soared about 8% on Tuesday from an 18-month low in the prior session on the possibility Freeport could restart soon and on forecasts for much colder weather and higher heating demand over the next two weeks than previously expected.

Freeport’s restart timeline, however, has been delayed many times from October to November to December and then most recently to January. Even when the company was saying the plant could restart last year, many analysts said it was likely to take Freeport until the first or second quarter of 2023 to get the plant ready due to the large amount of work needed to satisfy federal regulators, including training staff in new safety procedures.

Last week after sources told Reuters the plant would not return until February or later, at least two LNG vessels gave up on Freeport and moved to other ports, according to ship tracking data from Refinitiv. Whenever Freeport returns, US gas demand will jump. The plant can turn about 2.1 billion cubic feet per day (bcfd) of gas into LNG, which is about 2% of US daily production.

Comments

Comments are closed.