AGL 38.00 Decreased By ▼ -0.25 (-0.65%)
AIRLINK 136.45 Decreased By ▼ -2.52 (-1.81%)
BOP 5.44 Decreased By ▼ -0.01 (-0.18%)
CNERGY 3.80 Increased By ▲ 0.01 (0.26%)
DCL 7.50 Decreased By ▼ -0.07 (-0.92%)
DFML 45.41 Decreased By ▼ -0.74 (-1.6%)
DGKC 78.52 Increased By ▲ 0.41 (0.52%)
FCCL 28.89 Decreased By ▼ -0.21 (-0.72%)
FFBL 57.00 Decreased By ▼ -0.10 (-0.18%)
FFL 9.27 Increased By ▲ 0.57 (6.55%)
HUBC 96.80 Decreased By ▼ -5.02 (-4.93%)
HUMNL 13.40 Decreased By ▼ -0.85 (-5.96%)
KEL 3.77 Decreased By ▼ -0.05 (-1.31%)
KOSM 7.28 Decreased By ▼ -0.12 (-1.62%)
MLCF 37.80 Decreased By ▼ -0.55 (-1.43%)
NBP 67.50 Decreased By ▼ -2.00 (-2.88%)
OGDC 167.52 Decreased By ▼ -2.50 (-1.47%)
PAEL 25.10 Decreased By ▼ -0.55 (-2.14%)
PIBTL 6.70 Increased By ▲ 0.10 (1.52%)
PPL 131.50 Decreased By ▼ -2.08 (-1.56%)
PRL 26.40 Increased By ▲ 1.40 (5.6%)
PTC 15.10 Decreased By ▼ -0.44 (-2.83%)
SEARL 62.25 Decreased By ▼ -1.58 (-2.48%)
TELE 7.00 Increased By ▲ 0.05 (0.72%)
TOMCL 36.23 Decreased By ▼ -0.75 (-2.03%)
TPLP 7.88 Increased By ▲ 0.18 (2.34%)
TREET 14.00 Increased By ▲ 0.04 (0.29%)
TRG 44.55 Decreased By ▼ -0.42 (-0.93%)
UNITY 25.85 Increased By ▲ 0.45 (1.77%)
WTL 1.22 No Change ▼ 0.00 (0%)
BR100 9,143 Decreased By -61.6 (-0.67%)
BR30 27,326 Decreased By -391.2 (-1.41%)
KSE100 85,585 Decreased By -620.2 (-0.72%)
KSE30 26,984 Decreased By -252.2 (-0.93%)

KARACHI: Mari Petroleum Company Limited (MPCL) has successfully completed the construction of SGPC Phase-II facilities to process low Btu gas from Goru-B reservoir of Mari Gas Field, Daharki, Sindh.

According to material information sent to Pakistan Stock Exchange on Friday, the phased commissioning and performance testing of the processing facilities is ongoing. After processing, 50 Million Standard Cubic Feet per Day (MMSCFD) of pipeline specification gas is being achieved and the Company is supplying around 47.5 MMSCFD of processed gas to SNGPL, while the remaining 2.5 MMSCFD is consumed as fuel gas to operate the plant.

The gas is being supplied via MPCL’s own 20 inch, 25 km long, cross country gas transmission pipeline connecting SGPC to SNGPL valve assembly (QV -2) at Muhammadpur.

Copyright Business Recorder, 2023

Comments

Comments are closed.