AIRLINK 197.97 Decreased By ▼ -3.27 (-1.62%)
BOP 10.04 Increased By ▲ 0.07 (0.7%)
CNERGY 7.29 Increased By ▲ 0.40 (5.81%)
FCCL 36.00 Increased By ▲ 0.64 (1.81%)
FFL 16.91 Decreased By ▼ -0.24 (-1.4%)
FLYNG 25.04 Increased By ▲ 0.83 (3.43%)
HUBC 134.03 Decreased By ▼ -4.16 (-3.01%)
HUMNL 14.14 Increased By ▲ 0.07 (0.5%)
KEL 4.78 Decreased By ▼ -0.08 (-1.65%)
KOSM 6.94 Increased By ▲ 0.28 (4.2%)
MLCF 44.98 Decreased By ▼ -1.33 (-2.87%)
OGDC 218.23 Decreased By ▼ -4.31 (-1.94%)
PACE 6.94 Decreased By ▼ -0.12 (-1.7%)
PAEL 41.42 Decreased By ▼ -1.72 (-3.99%)
PIAHCLA 16.86 Decreased By ▼ -0.17 (-1%)
PIBTL 8.46 Decreased By ▼ -0.08 (-0.94%)
POWER 9.39 Increased By ▲ 0.29 (3.19%)
PPL 185.93 Decreased By ▼ -2.83 (-1.5%)
PRL 41.27 Decreased By ▼ -2.00 (-4.62%)
PTC 24.77 Decreased By ▼ -0.58 (-2.29%)
SEARL 104.65 Decreased By ▼ -5.77 (-5.23%)
SILK 1.01 Decreased By ▼ -0.02 (-1.94%)
SSGC 40.91 Decreased By ▼ -1.73 (-4.06%)
SYM 18.05 Decreased By ▼ -0.52 (-2.8%)
TELE 8.91 Decreased By ▼ -0.21 (-2.3%)
TPLP 12.84 Decreased By ▼ -0.84 (-6.14%)
TRG 66.60 Decreased By ▼ -1.56 (-2.29%)
WAVESAPP 11.30 Increased By ▲ 1.03 (10.03%)
WTL 1.78 Decreased By ▼ -0.09 (-4.81%)
YOUW 4.00 Decreased By ▼ -0.01 (-0.25%)
BR100 12,077 Decreased By -142.4 (-1.17%)
BR30 36,524 Decreased By -793.3 (-2.13%)
KSE100 115,042 Decreased By -802.6 (-0.69%)
KSE30 36,200 Decreased By -276.6 (-0.76%)

KARACHI: Mari Petroleum Company Limited (MPCL) has successfully completed the construction of SGPC Phase-II facilities to process low Btu gas from Goru-B reservoir of Mari Gas Field, Daharki, Sindh.

According to material information sent to Pakistan Stock Exchange on Friday, the phased commissioning and performance testing of the processing facilities is ongoing. After processing, 50 Million Standard Cubic Feet per Day (MMSCFD) of pipeline specification gas is being achieved and the Company is supplying around 47.5 MMSCFD of processed gas to SNGPL, while the remaining 2.5 MMSCFD is consumed as fuel gas to operate the plant.

The gas is being supplied via MPCL’s own 20 inch, 25 km long, cross country gas transmission pipeline connecting SGPC to SNGPL valve assembly (QV -2) at Muhammadpur.

Copyright Business Recorder, 2023

Comments

Comments are closed.