AIRLINK 191.84 Decreased By ▼ -1.66 (-0.86%)
BOP 9.87 Increased By ▲ 0.23 (2.39%)
CNERGY 7.67 Increased By ▲ 0.14 (1.86%)
FCCL 37.86 Increased By ▲ 0.16 (0.42%)
FFL 15.76 Increased By ▲ 0.16 (1.03%)
FLYNG 25.31 Decreased By ▼ -0.28 (-1.09%)
HUBC 130.17 Increased By ▲ 3.10 (2.44%)
HUMNL 13.59 Increased By ▲ 0.09 (0.67%)
KEL 4.67 Increased By ▲ 0.09 (1.97%)
KOSM 6.21 Increased By ▲ 0.11 (1.8%)
MLCF 44.29 Increased By ▲ 0.33 (0.75%)
OGDC 206.87 Increased By ▲ 3.63 (1.79%)
PACE 6.56 Increased By ▲ 0.16 (2.5%)
PAEL 40.55 Decreased By ▼ -0.43 (-1.05%)
PIAHCLA 17.59 Increased By ▲ 0.10 (0.57%)
PIBTL 8.07 Increased By ▲ 0.41 (5.35%)
POWER 9.24 Increased By ▲ 0.16 (1.76%)
PPL 178.56 Increased By ▲ 4.31 (2.47%)
PRL 39.08 Increased By ▲ 1.01 (2.65%)
PTC 24.14 Increased By ▲ 0.07 (0.29%)
SEARL 107.85 Increased By ▲ 0.61 (0.57%)
SILK 0.97 No Change ▼ 0.00 (0%)
SSGC 39.11 Increased By ▲ 2.71 (7.45%)
SYM 19.12 Increased By ▲ 0.08 (0.42%)
TELE 8.60 Increased By ▲ 0.36 (4.37%)
TPLP 12.37 Increased By ▲ 0.59 (5.01%)
TRG 66.01 Increased By ▲ 1.13 (1.74%)
WAVESAPP 12.78 Increased By ▲ 1.15 (9.89%)
WTL 1.70 Increased By ▲ 0.02 (1.19%)
YOUW 3.95 Increased By ▲ 0.10 (2.6%)
BR100 11,930 Increased By 162.4 (1.38%)
BR30 35,660 Increased By 695.9 (1.99%)
KSE100 113,206 Increased By 1719 (1.54%)
KSE30 35,565 Increased By 630.8 (1.81%)

QUETTA: Chief Secretary Balochistan Abdul Aziz Aqeeli said that Prime Minister Shehbaz Sharif will inaugurate 100 MW Iran-Gwadar power transmission project during his visit to Balochistan next week. He said this while addressing a high level meeting to review the ongoing uplift projects in the Gwadar.

The Chief Secretary noted that under power transmission project, Gwadar will get 100, megawatt electricity from Iran. In this regard, National Dispatch Company, Quetta Electric Supply Company, Gwadar Port Authority, Gwadar Development Authority, China Overseas Port Holding Company and other related departments have completed their preparations.

He further said that after the unveiling of the project by the Prime Minister, the electricity supply to Gwadar will be formally started.

“During his visit, the PM will also open the project of the first cross-stuffing facility at Gwadar port, dredging at Gwadar port. Besides, distribution of boat engine checks to the deserving fishermen of Gwadar will also be done.

The CS stressed that the incumbent government is committed to the development of the coastal belt of Balochistan and through various uplift projects launched in the province, trying to benefit the local people of Balochistan.

“The implementation of all these projects is part of the vision of the PM Pakistan for Balochistan,” he emphasized.

Earlier, the Chief Secretary Balochistan was briefed about the administrative structure of Gwadar district, historical importance and ongoing development projects by the federal and provincial governments.

Commissioner Makran Syed Faasil Ahmed Agha, DG GDA Mujibur Rehman Qambrani, DC Gwadar Izzat Nazir Baloch and other officials informed the CS about the progress of the projects made so far. The arrangements and preparations for the expected visit of PM Shehbaz Sharif to Gwadar were also reviewed.

Comments

Comments are closed.