AGL 37.72 Decreased By ▼ -0.22 (-0.58%)
AIRLINK 168.65 Increased By ▲ 13.43 (8.65%)
BOP 9.09 Increased By ▲ 0.02 (0.22%)
CNERGY 6.85 Increased By ▲ 0.13 (1.93%)
DCL 10.05 Increased By ▲ 0.52 (5.46%)
DFML 40.64 Increased By ▲ 0.33 (0.82%)
DGKC 93.24 Increased By ▲ 0.29 (0.31%)
FCCL 37.92 Decreased By ▼ -0.46 (-1.2%)
FFBL 78.72 Increased By ▲ 0.14 (0.18%)
FFL 13.46 Decreased By ▼ -0.14 (-1.03%)
HUBC 114.10 Increased By ▲ 3.91 (3.55%)
HUMNL 14.95 Increased By ▲ 0.06 (0.4%)
KEL 5.75 Increased By ▲ 0.02 (0.35%)
KOSM 8.23 Decreased By ▼ -0.24 (-2.83%)
MLCF 45.49 Decreased By ▼ -0.17 (-0.37%)
NBP 74.92 Decreased By ▼ -1.25 (-1.64%)
OGDC 192.93 Increased By ▲ 1.06 (0.55%)
PAEL 32.24 Increased By ▲ 1.76 (5.77%)
PIBTL 8.57 Increased By ▲ 0.41 (5.02%)
PPL 167.38 Increased By ▲ 0.82 (0.49%)
PRL 31.01 Increased By ▲ 1.57 (5.33%)
PTC 22.08 Increased By ▲ 2.01 (10.01%)
SEARL 100.83 Increased By ▲ 4.21 (4.36%)
TELE 8.45 Increased By ▲ 0.18 (2.18%)
TOMCL 34.84 Increased By ▲ 0.58 (1.69%)
TPLP 11.24 Increased By ▲ 1.02 (9.98%)
TREET 18.63 Increased By ▲ 0.97 (5.49%)
TRG 60.74 Decreased By ▼ -0.51 (-0.83%)
UNITY 31.98 Increased By ▲ 0.01 (0.03%)
WTL 1.61 Increased By ▲ 0.14 (9.52%)
BR100 11,289 Increased By 73.1 (0.65%)
BR30 34,140 Increased By 489.6 (1.45%)
KSE100 105,104 Increased By 545.3 (0.52%)
KSE30 32,554 Increased By 188.3 (0.58%)

LAHORE: The Kachhi Canal Extension Project being constructed by WAPDA in District Dera Bugti of Balochistan will be completed in couple of months to irrigate another 30,000 acres of land in the project area. Consequently, the command area of Kachhi Canal Phase-I will extend to 102,000 acres.

Chairman WAPDA Engr Lt Gen Sajjad Ghani (retd) was briefed during his visit to Kachhi Canal Extension Project. GM (Central) and PD Kachhi Canal Project Syed Ali Akhtar Shah, consultants and the contractors, apprised the Chairman about progress on Kachhi Canal Extension Project.

It was briefed that construction work on 40-km main lined canal, allied structures and 32-Km water distribution system is complete except at a couple of sites which is likely to be completed soon. Later, the Chairman WAPDA had a detailed round of the main canal, allied structures and the distribution system.

Speaking on the occasion, the Chairman said that Kachhi Canal is a significant project to alleviate poverty from backward and remote areas of Balochistan by developing irrigated agriculture and agro-based economy in the province. Command area development is equally important to accrue benefits from Kachhi Canal Extension Project, therefore, it is hoped the government of Balochistan will be able to develop the command area without any delay, he added.

The Chairman was also briefed about the plan for restoration of the 363-Km main canal which was made functional in 2017 but was damaged at certain stretches due to the devastating flood in August last year.

Copyright Business Recorder, 2023

Comments

Comments are closed.