AGL 40.00 Decreased By ▼ -0.16 (-0.4%)
AIRLINK 129.53 Decreased By ▼ -2.20 (-1.67%)
BOP 6.68 Decreased By ▼ -0.01 (-0.15%)
CNERGY 4.63 Increased By ▲ 0.16 (3.58%)
DCL 8.94 Increased By ▲ 0.12 (1.36%)
DFML 41.69 Increased By ▲ 1.08 (2.66%)
DGKC 83.77 Decreased By ▼ -0.31 (-0.37%)
FCCL 32.77 Increased By ▲ 0.43 (1.33%)
FFBL 75.47 Increased By ▲ 6.86 (10%)
FFL 11.47 Increased By ▲ 0.12 (1.06%)
HUBC 110.55 Decreased By ▼ -1.21 (-1.08%)
HUMNL 14.56 Increased By ▲ 0.25 (1.75%)
KEL 5.39 Increased By ▲ 0.17 (3.26%)
KOSM 8.40 Decreased By ▼ -0.58 (-6.46%)
MLCF 39.79 Increased By ▲ 0.36 (0.91%)
NBP 60.29 No Change ▼ 0.00 (0%)
OGDC 199.66 Increased By ▲ 4.72 (2.42%)
PAEL 26.65 Decreased By ▼ -0.04 (-0.15%)
PIBTL 7.66 Increased By ▲ 0.18 (2.41%)
PPL 157.92 Increased By ▲ 2.15 (1.38%)
PRL 26.73 Increased By ▲ 0.05 (0.19%)
PTC 18.46 Increased By ▲ 0.16 (0.87%)
SEARL 82.44 Decreased By ▼ -0.58 (-0.7%)
TELE 8.31 Increased By ▲ 0.08 (0.97%)
TOMCL 34.51 Decreased By ▼ -0.04 (-0.12%)
TPLP 9.06 Increased By ▲ 0.25 (2.84%)
TREET 17.47 Increased By ▲ 0.77 (4.61%)
TRG 61.32 Decreased By ▼ -1.13 (-1.81%)
UNITY 27.43 Decreased By ▼ -0.01 (-0.04%)
WTL 1.38 Increased By ▲ 0.10 (7.81%)
BR100 10,407 Increased By 220 (2.16%)
BR30 31,713 Increased By 377.1 (1.2%)
KSE100 97,328 Increased By 1781.9 (1.86%)
KSE30 30,192 Increased By 614.4 (2.08%)

ISLAMABAD: Asia Petroleum Limited (APL) has proposed repurposing its pipeline to transport High Speed Diesel (HSD) from Hub to Zulfiqarabad Oil Terminal (ZOT) and from there to upcountry through the White Oil Pipeline System (WOP) as Hubco is consistently on low in merit.

In a letter to Petroleum Division, Babar Hamid Chaudhary, MD/ CEO APL referred to the Implementation Agreement (IA) of June 28, 2003 between the President of Pakistan (GoP) and APL and the meeting on February 7, 2023 during which this matter was discussed in detail.

APL is an energy infrastructure company which owns and operates an oil terminal (mainly comprising of pumping and heating facilities) and an 82-km pipeline system extending from Pakistan State Oil Company Limited’s (PSO) Zulfiqarabad Oil Terminal (ZOT) at Port Qasim Karachi to the Hub Power Company Limited (Hubco) Complex at Hub Balochistan

PL on HSD to go up by Rs5/litre

The Pipeline was constructed to transport the Residual Fuel Oil (RFO) requirements of Hubco (the first independent power project established in Pakistan) from ZOT to enable PSO to meet its RFO delivery commitments under its Fuel Supply Agreement with Hubco (FSA). Under the arrangements, APL’s role is limited to transportation. The pipeline operates under a security package of documents (APL Security Package) including the IA and a Fuel Transportation Agreement (FTA) with PSO. The initial term of these documents and of PSO’s obligations to supply RFO to Hubco are scheduled to expire in March 2027.

CEO APL further elaborated that the pipeline is currently dedicated to the movement of RFO to Hubco but given the dwindling use of RFO and increasing preference given for more cost-effective power generation options, Hubco has, over the last few years, consistently been low on the merit order and so its dispatch is very low and is likely to remain so. This means that the pipeline, which provides a safe environmentally friendly and efficient link between Hub, Balochistan and ZOT is seriously underutilized and often idle which is unconscionable for such an important strategic asset. While the APL Security Package does contemplate supply to other parties, given the dwindling use of RFO and lack of alternate RFO customers in the area, it is not feasible to use the pipeline for supply of RFO to other parties in the vicinity.

Copyright Business Recorder, 2023

Comments

Comments are closed.

Aamir Latif May 29, 2023 10:49am
Long over due to revive unproductive business model of APL... A petroleum product pipeline network badly under utilized... Instead decade old business model of having crude storage terminal using SBM's and using VLCC to import crude as best option due to its economic of scale to these small 75,000dwt tankers in PQA or KPT... Difference of freight was $3 / ton then in 2007 when I worked on this project... GoP should seriously revitalize this business model, will use existing pipeline connectivity with NRL , PRL and PARCO black oil. PARCO's coastal Refinery in Hub when constructed can be easily connected using APL pipeline ROW...
thumb_up Recommended (0)